钻井工程英文课件22.3 Drillstem Testing.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
22.3-* Drillstem Testing 22.3 22.3-* DST assembly using two straddle packers 22.3-* Test Tree 22.3-* Test Choke 22.3-* Typical DST The typical drill stem test will be split into four period, Pre flow.? initial shut in period, a main flow period and a final shut in period. Times of for each test are dependent on conditions at the well site Drill stem tests may be run at any time during the drilling operation at the current depth or may be used to test any interval in the hole after TD has been reached. Using these data and based on the evaluation of engineers and geologists, management can base a decision to complete the hole for potential production of oil or gas or proceed with abandonment. 22.3-* Pre-Flow Period is a? production period to clean up the well and is used to remove any supercharge given to the formation due to mud infiltrating into the prospective formation during the drilling operation. 22.3-* Initial Shut In This period is to allow the formation to recover from pressure surges caused during the pre flow. this is often referred to as closed in for the pressure build up this period will be? longer. 22.3-* Main Flow a more lengthy production period designed to test the formations flow characteristics more rigorously. Samples of any fluids will be checked for water content Gas bubble bust pressure? temperature and many other nice surprises. This will be done using set choke or variable chokes. Sample? reaching surface will be measured as to volume and gathered for analysis in a laboratory. Samples of any fluids in the drill string at the conclusion of the test will be measured as to volume and gathered for analysis. Flowing pressures and temperatures will be recorded. 22.3-* Final Shut-In formation pressure is recorded over this period. The shape of the pressure build up curve will tell us the permeability of the formation, the degree of formation damage (likely caused during the drilling operation), It? will also tell us if we have found a small

文档评论(0)

Jermain2014 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档