MachineProductionActivityControl(生产活动控制).ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MachineProductionActivityControl(生产活动控制).ppt

Production Activity Control Production Activity Control (生產活動控制) Lower Bound 計算方法實例: Production Activity Control (生產活動控制) Integer Programming Approach (Branch and Bound) 0 1 2 4 3 31 32 13 14 34 12 LB(1)=57 LB(2)=62 LB(3)=58 LB(4)=71 LB(12)=64 LB(13)=61 LB(14)=70 LB(31)=58 LB(32)=65 LB(34)=62 312 314 尋找最小者作 Branch * * Production Activity Control (生產活動控制) Introduction MRP CRP Order (工單) release planning Order release (工單發放) Dispatching (派工) Production report (生產績效) I/O Control Priority Control Production Activity Control (生產活動控制) Objectives (1) 確保工單能如期完成。 (2) 瞭解並掌握現場所有的製造資訊 ─ 機台狀況, 品質狀況,工單進度。 PAC I/O Control Priority Control 現場資訊收集 Orders Priority (Dispatching) Rule 現場資訊(機台狀況, 品質狀況,工單進度) Routing File, Work Center File 投入/產出報表 派工單 生產績效報表 Goals of Priority Control Minimal WIP Short Customer Lead Time Maximum Utilization of Resources On-Time Delivery Balance Production Activity Control (生產活動控制) Meeting Due Dates - Performance Measures Service Level - It is the fraction of jobs whose cycle time is less than or equal to their planned lead time. (make to order) Fill Rate - It is defined as the fraction of demands that are met from inventory. (make to stock) Lateness - The difference between the order due date and the completion time of job. Tardiness - It is the lateness of a job is it is late and zero otherwise. Production Activity Control (生產活動控制) Maximizing Utilization Utilization capital equipment Return on Investment Cost Accounting Revenue Production Activity Control (生產活動控制) Maximizing Utilization Utilization capital equipment Inventory Profit ??? Production Activity Control (生產活動控制) Maximizing Utilization 有效產出 存貨 營運費用 生產管理目標 Production Activity Control (生產活動控制) Maximizing Utilization 資源 瓶頸資源 非瓶頸資源 Note: 任何資源,只要它的產能等於或小於它的需求 則稱之為瓶頸資源。 Production Activity Control (生產活動控制) Maximizing Utilization 瓶頸資源 非瓶頸資源 通過瓶頸的流量 = 市場需求 平衡流量 瓶頸資源 非瓶頸資源 瓶頸資

文档评论(0)

sunyangbill + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档