- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
China: Water Management and Accounting Project May 22-24, 2006 Hague Contents Part 1. Water management status in China Part 2. Cooperation project related to SEEAW (as planed) Part 3. Integrated water management based on water accounts (as planed) Part 1. Water Management Status in China A. Water related problems B. Water policy and practice A. Water related problems a) uneven distribution of water resources b) water shortage aggravates c) serious flood damage d) serious water pollution e) problems related to water ecology and environment b) water shortage, conflict between water demand and supply worsen c) flood control capacity is fairly low, flood damage is serious d) serious water pollution intensifies water shortage B. Water policy and practice In recent years, guided by the concept of sustainable water management, China has established series of water policies and achieved new progress. a) Drinking water safety is priority b) Develop a water saving society c) accelerate construction of flood-control and disaster-mitigation system to ensure flood control security d) emphasize food security and improve supporting and protecting systems for agriculture e) Accelerate construction of water allocation projects to enhance regulation on temporal and spatial distribution of water f) strengthen water pollution prevention to restrain further deterioration of water environment h) Improve Water management system and mechanism Part 2. Cooperation project related to SEEAW (as planed) Cooperation form Accounting contents Working stages Cooperation form Collaborator: MWR: Data source NBS: National Accounting Background Supporter: UNSD: Implementation of SEEAW B. Accounting contents Physical accounts Flow: SUT, emission accounts Stock: asset accounts, quality accounts Monetary accounts Protect expenditure C. Working stages Staff training Data collection (statistics and surveys) River basin trial
您可能关注的文档
最近下载
- 质子治疗与护理.pptx
- 李清照《声声慢》完整教学课件.ppt VIP
- DL-T5210-2021电力建设施工质量验收及评价规程最新表格.docx
- 在线网课学习课堂《雷达原理》单元测试考核答案.docx VIP
- 《工程勘察设计收费标准》2002年修订本完整.pdf VIP
- 服装行业智能化产业生态构建策略研究:2025年现状与未来五到十年展望.docx
- SCIP准备和提交教程.pdf VIP
- 在线网课学习课堂《雷达原理与系统(中国人民解放军战略支援部队信息工程)》单元测试考核答案.docx VIP
- 城市轨道交通调度指挥:列车运行计划及列车运行图PPT教学课件.pptx
- 社会影响力投资手册.pdf
原创力文档


文档评论(0)