- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
12 The APQP Project Plan GM 1927-1, consists of 17 major deliverables/requirements These items if completed properly and on time should result in the development of a manufacturing system that is capable of meeting the GM Quality requirements at stated capacity and ship schedules. 33 34 Introduce and establish ownership of the process Identify the Program and roll out the AP process Provide understanding of the GM Engineering and AP process including timing issues Define the Quality requirements Provide Warranty information – requirements if applicable Define vehicle interface issues – potential problems with other systems Identify potential roadblocks Develop broad/generic function requirements Define guidelines and expectations for the Supplier Workshop Identify GM participants (Core Group) and suppliers for participation in the Technical Review Meeting Establish dates Determine how best to communicate with stakeholders MProgram Management RASIC (GM1927-22M) APQP Open Issues List (GM 1927-5) 34 Introduce and establish ownership of the process Identify the Program and roll out the AP process Provide understanding of the GM Engineering and AP process including timing issues Define the Quality requirements Provide Warranty information – requirements if applicable Define vehicle interface issues – potential problems with other systems Identify potential roadblocks Develop broad/generic function requirements Define guidelines and expectations for the Supplier Workshop Identify GM participants (Core Group) and suppliers for participation in the Technical Review Meeting Establish dates Determine how best to communicate with stakeholders MProgram Management RASIC (GM1927-22M) APQP Open Issues List (GM 1927-5) 43 35 35 37 Review PPAP plan and requirements - PPAP submission level, PPAP production date, measurement and test plan, submission requirements Review supplier’s plan for start of production, material ordering, shipping, pipeline build up and parts bankin
您可能关注的文档
- 护理人员职业暴露与防护措施方案.ppt
- 护理实习生带教记录本(_护理部).doc
- 《创新设计》2017届高考物理二轮复习(全国通用)课件+Word版训练专题三电场和磁场第2讲带电粒子的运动.ppt
- 《机械设计》课程设计报告书.ppt
- 《减数分裂》优质课课件(一等奖课件).ppt
- 《危险化学品仓库建设与储存安全规范》DB11755_2010_解读.ppt
- 《危险化学品仓库建设与储存安全规范》DB11755_2010解读.ppt
- 《我站在铁索桥上》PPT课件.ppt
- 《小鸟和小猫》课件(冀教版五年级(下册)科学课件).ppt
- 【创新设计】2013_2014学年高中语文3_4论厄运直面苦难(节选)课件苏教版必修5.ppt
文档评论(0)