福岛核电站泄露程揭秘
The Fukushima DaiichiIncident The Fukushima Daiichi Incident 1. Plant Design Fukushima Daiichi (Plant I) Unit I - GE Mark I BWR (439?MW), Operating since 1971 Unit II-IV - GE Mark I BWR (760?MW), Operating since 1974 The Fukushima Daiichi Incident 1. Plant Design Building structure Concrete Building Steel-framed Service Floor The Fukushima Daiichi Incident – Dr. Matthias Braun - * - p.* Engineering Projects Organization The information in this document is AREVA property and is intended solely for the addressees. Reproduction and distribution are prohibited. Thank you Plant Design Accident Progression Radiological releases Spent fuel pools Sources of Information Matthias Braun PEPA4-G, AREVA–NP GmbH Matthias.Braun@AREVA.com /wiki/Browns_Ferry_Nuclear_Power_Plant Containment Pear-shaped Dry-Well Torus-shaped Wet-Well The Fukushima Daiichi Incident 1. Plant Design Service Floor The Fukushima Daiichi Incident 1. Plant Design Lifting the Containment closure head The Fukushima Daiichi Incident 1. Plant Design Reactor Service Floor(Steel Construction) Concrete Reactor Building(secondary Containment) Reactor Core Reactor Pressure Vessel Containment (Dry well) Containment (Wet Well) / Condensation Chamber Spend Fuel Pool Fresh Steam line Main Feedwater The Fukushima Daiichi Incident 2. Accident progression 11.3.2011 14:46 - Earthquake Magnitude 9 Power grid in northern Japan fails Reactors itself are mainly undamaged SCRAM Power generation due to Fission of Uranium stops Heat generation due to radioactive Decay of Fission Products After Scram ~6% After 1 Day ~1% After 5 Days ~0.5% The Fukushima Daiichi Incident 2. Accident progression Containment Isolation Closing of all non-safety related Penetrations of the containment Cuts off Machine hall If containment isolation succeeds, a large early release of fission products is highly unlikely Diesel generators start Emergency Core cooling systems are supplied Plant is
您可能关注的文档
- 社会保险培训ppt课件.ppt
- 社会主义法治理念总全文.doc
- 社会保障概论 第九章 补充保障.ppt
- 社会保障法的产和发展.ppt
- 社会分工和国际不断深化生产的社会化和国际化程度不.ppt
- 社会分工和国际工不断深化生产的社会化和国际化程度不.ppt
- 社会卫生状况与会卫生策略.ppt
- 社会和科技的发,是人类文明进步的标志,但是人们在谋思发展的同时,....ppt
- 社会存在与社会识的关系.ppt
- 社会共同参与 进艾滋病综合防治.ppt
- 2025年全国演出经纪人员资格认定考试试卷带答案(研优卷).docx
- 2025年全国演出经纪人员资格认定考试试卷完整版.docx
- 2025年全国演出经纪人员资格认定考试试题库及完整答案.docx
- 2025年全国演出经纪人员资格认定考试试卷完美版.docx
- 2025年全国演出经纪人员资格认定考试试卷含答案(实用).docx
- 2025年全国演出经纪人员资格认定考试试卷及答案(各地真题).docx
- 2025年下半年内江市部分事业单位公开考试招聘工作人员(240人)备考题库附答案.docx
- 2025年全国演出经纪人员资格认定考试试卷及答案1套.docx
- 2025年下半年四川成都市郫都区面向社会引进公共类事业单位人员2人备考题库最新.docx
- 2025年下半年内江市部分事业单位公开考试招聘工作人员(240人)备考题库附答案.docx
最近下载
- 中小学教育教学常规讲座.pptx VIP
- 2025年渤海船舶职业学院单招数学考试模拟试题及答案解析.docx VIP
- 2024年渤海船舶职业学院单招数学考试试题及答案解析.docx VIP
- 2025年项目管理专业计划价值与项目报告编制专题试卷及解析.pdf VIP
- 2025年演出经纪人脑机接口技术在演出体验中的未来展望专题试卷及解析.pdf VIP
- 2025年碳排放管理师碳期权做市商的定价与风险管理专题试卷及解析.pdf VIP
- 2025年特许金融分析师抵押贷款支持证券的综合案例分析专题试卷及解析.pdf VIP
- 2025年金融风险管理师内部评级法下信用风险缓释的资本计算专题试卷及解析.pdf VIP
- 2025年AWS认证AmazonRDS只读副本的只读副本的跨区域数据传输安全专题试卷及解析.pdf VIP
- ZCC5000-1履带式起重机技术规格书.pdf VIP
原创力文档

文档评论(0)