- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FT简要介绍 General Description
FT设备 FT Equipment
测试机信息 TEST Machine Information
测试顺序与功能 General Test Sequence and Function
;2;General Description; 程序逻辑控制器控制FT测试系统所有部件的动作。Programmable Logic Controller (PLC) controls all system tooling motions.
人机界面装置与PLC联机,监控/控制设备操作或手动操作。Human-Machine Interface (HMI) allows the operator to monitor and control system operation both in automatic and manual modes. It is connected to PLC.{操作面板}
测试机收集处理测试的变速箱数据,并与PLC联机传递接受命令。The test computer controls transmission test data. It interfaces with the stand PLC, transmitting and receiving commands.(计算、发指令、采集数据);FT Equipment--Trans Location;The headstock
夹紧保持变扭器壳体。Engages and secures the transmission housing.
位于测试机变扭器壳体边。The headstock assembly is mounted below housing side of the test stand.
所有定位夹紧设备移动精度均在0.5mm以内,测试结束后自动返回原位。Be able to consistently hold position within a tolerance of 0.5mm. The device must be returned to the normal position by the test machine at the end of the test. ;FT Equipment--Trans Location;FT Equipment--Trans Location;FT Equipment– Input Drive Assembly;FT Equipment– Output Drive Assembly;Tool changer
具变速箱型号自动选择输出工具。Automatically select the slave adaptor for the output drive assembly based on the model being tested.
工具更换装置能够防止变速箱密封/衬套损伤。The tooling be designed to prevent damage to the transmission oil seals or bushings during automatic engagement and testing.;FT Equipment– Probes;The Bubbler probe measures the test oil level inside the transmission during the fill, test and evacuation step of the test sequence.
油位探针-在充油,测试,放油步骤中测量变速箱内油位。;FT Equipment– Test oil system;FT Equipment– Test oil system;Test Machine Information-PCS;Test Machine Information-PCS;Test Machine Information-PCS;19;STEP 1: ELECTRICAL CHECK
description: Use GMLAN commands and feedback to verify TEHCM communication and electrical integrity of components in the TEHCM.
purpose: To do the following:
? Verify communication with the TEHCM.
? Detect electrical opens/shorts.
? Detec
您可能关注的文档
- 腹透居家指导..ppt
- 臂丛颈丛麻醉幻灯片..ppt
- 膏体充填采矿技术..ppt
- 膜过滤在水处理系统中的应用 (2)..ppt
- 膀胱镜的日常维护..pptx
- 膀胱造瘘患者的护..ppt
- 膨化产品加工工艺图解..ppt
- 腾俊国际陆港 大商贸篇1..pptx
- 腾鲤2011年08月青岛银座领海公馆开盘前后推广工作汇报..ppt
- 腾讯云产品服务介绍..pptx
- 化妆品公司动力部年度总结.pptx
- 七年级下册(2024)第六单元课外古诗诵读之《约客》课件(共26张PPT).pptx
- 24《寓言四则》优质课教学课件(共15张PPT).ppt
- 七年级下册(2024)第六单元课外古诗诵读之《竹里馆》课件(共26张PPT).pptx
- LIMS供应商概览与技术标书.pdf
- 线缆厂薪酬核算管理规章.doc
- 《课外古诗词诵读——逢入京使 》课件(共22张PPT)2025—2026学年统编版语文七年级下册.pptx
- 《课外古诗词诵读——贾生》课件(共22张PPT)2025—2026学年统编版语文七年级下册.pptx
- 7 谁是最可爱的人 课件 (共20张PPT) 2025-2026学年统编版语文七年级下册.pptx
- 电池厂叠片机配件管理规范规章.doc
原创力文档


文档评论(0)