复杂项目调度中的逻辑关系表述及模型转换-计算机工程与应用.PDF

复杂项目调度中的逻辑关系表述及模型转换-计算机工程与应用.PDF

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
216 2018 ,54(13) Computer Engineering and Applications 计算机工程与应用 ⦾工程与应用⦾ 用 复杂项目调度中的逻辑关系表述及模型转换 应 李云祥,宋元斌,范晨昊 与 LI Yunxiang, SONG Yuanbin, FAN Chenhao 程 g 上海交通大学 船舶海洋与建筑工程学院,上海 200240 r 工 o School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiaotong University, Shanghai 200240, China . 机 j a LI Yunxiang, SONG Yuanbin, FAN Chenhao. Logical relationship representation and model transformation in e complex project scheduling. Computer Engineering and Applications, 2018, 54 (13):216-223. 算 c 计 . Abstract :More than one construction sequencing alternatives may be available for a complex construction project. w Besides temporal relationships between construction activities, the logic relationships should also be semantically repre- w sented in a construction scheduling. The representation of two typical logical relationships, i.e.exclusive alternative and w co-existing, are firstly explored, and then the associations between those logical relationships are evaluated. Subsequently, a unified framework is developed to abstract both temporal and logical relationships among various activities. Furthermore, the rules defining the conversion from a complex schedule model to the corresponding mixed integer linear programming model are developed for developing model conversion software. Finally, an engineering case has been studied to demon- strate and verify the application of the developed tools. Key words :project schedule; alternative sequencing program; temporal relationship; logical relation

文档评论(0)

fengruiling + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档