DLT1083-2008 火力发电厂分散控制系统技术条件(完整版).doc

DLT1083-2008 火力发电厂分散控制系统技术条件(完整版).doc

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
DL / T 1083 — 2008 ICS 27.100 P 61 备案号:24181-2008 中华人民共和国电力行业标准 DL / T 1083 — 2008 火力发电厂分散控制系统技术条件 第一章、 Specification of distributed control system for fossil fuel power plant 2008-06-04发布 2008-11-01实施 中华人民共和国国家发展和改革委员会 发 布 I DL / T 1083 — 2008 第二章、 目 次 前言··································Ⅱ 1 范围 ································ 1 2 规范性引用文件 ··························· 1 3 术语和定义 ····························· 2 4 总则 ································ 3 4. 1 数据通信网络 ····························· 3 4. 2 DCS 应用软件的要求 ··························· 4 4. 配 3 控制处理器 置要求··························· 4 4.4 DCS 4.5 故障情况下的一般安全要求 ······················· 5 对 DCS 硬件质量的要求 ·························· 5 4.6 DCS设备供货和工程设计能力 ························ 5 4.7 可用率考核和可靠性评估 ························· 6 5 应用功能要求 ····························· 7 5.1 数据采集和人—机界面 ·························· 7 5.2 模拟量控制 ······························ 9 5.3 5.4 开关量控制和顺序控制 ··························17 公用设备控制系统 ···························19 6 硬件和系统软件要求···························20 6.1 总的要求 ······························20 6.2 6.3 6.4 6.5 通信网络 ······························20 电源 ································21 控制处理器(CP) ···························22 过程输入输出(I/O) ··························22 6.6 人—机接口 ······························24 6 .7 外围设备 ······························26 6.8 机柜和接地 ······························26 6.9 备品备件和专用工具 ···························27 7 文档和技术资料 ····························27 7.1 总则 7.2 ································27 硬件资料 ······························27 软件资料 ······························28 用户手册 ······························28 控制逻辑文件 ·····························28 7.3 7.4 7.5 7.6 I/O 7.7 清单·······························28 其他资料 ······························28 8 验收和测试 ······························29 8 .1 系统出厂验收(FAT) ··························29 8.2 现场验收 ······························29 8.3 系统功能和性能考核 ···························30 附录 A(规范性附录) DCS 硬件电磁兼容性(EMC)的技术规范 ········31 附录 B(资料性附录) DCS 可靠性评估班志摘抄记

您可能关注的文档

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档