- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
HK, age 35. Injuries to right ear and right shoulder. KJ, age 36. Foreign body in eyes. FH, age 28. Minor burns to both forearms. RR, age 37. Minor burns and abrasions from fall. Personal Injuries cont’d) 精品文档 RR, age 22. Minor burns and strained neck muscles. OJ, age 37. Muscular injury right thigh. SB, age 39. Splinter in arms. TT, age 46. ‘Shock’ and elevated BP “malignant”. FA, age 32. Sprained ankle. Personal Injuries (cont’d) 精品文档 Fortunate Events I Damage was mitigated because the predominantly ballistic or impact type of damage was confined to the NE direction which was unoccupied hillside. 精品文档 Damage was mitigated by the fact that several workers had gone to the canteen to eat. Fortunate Events II 精品文档 Some rainfall occurred 20 minutes before the explosion which resulted in several workers delaying in returning to the FCCU. Fortunate Events III 精品文档 85.10.17: Berth #5 Fire started - 12.35 pm Fire service - 12.45 pm Fire under control - 12.50 pm All clear given - 3.00 pm 精品文档 Background to Fire I In June 1985 a decision was taken to recommission the entire length of the 30-inch diameter sealine (S/L No. 33) running from the Pile Bent 80 manifold to No. 5 berth and terminating at No. 6 Berth. 精品文档 Background II The section of the line between No. 5 and No. 6 Berths (length 1200 ft) was the only inoperative part and was positively isolated from the rest of the line in 1975. This section had to be tested and repaired before being brought back into service. 精品文档 Between July and October 1985, the other portion of the line was in crude oil service, the last being the receipt of 319,000 bbls of Algerian Condensate on September 1. Background III 精品文档 By October 11, all activities related to the repairs of the disused section were completed. Background IV 精品文档 On October 17, equipment was mobilized and manpower allocated to the task of completing the final job to allow the re-commissioning of the entire length of S/L 33. Background V 精品文档 The last task
您可能关注的文档
- App-Development-for-Android课件.pptx
- Articulation-Treatment课件.pptx
- ASEAN-Pharmaceutical-Harmonization课件.ppt
- Asia-Economic-Weekly课件.pdf
- AT-1724Allison-Transmission,-Inc.-Global-Transport-Label-课件.pptx
- Azero:-一个大规模动态负载均衡图处理系统课件.pptx
- A包:会计系软件项目技术要求课件.doc
- A包:电气控制与PLC技术实验室课件.doc
- A级餐饮服务单位课件.doc
- B.-I.-T.-The-Way-Forward课件.pptx
文档评论(0)