网站大量收购独家精品文档,联系QQ:2885784924

北美交通信号控制系统.pptx

  1. 1、本文档共88页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Traffic Signal Control Systems 北美交通信号控制系统 The North America Practice;About Reno and UNR;Outline 主要内容;Traffic Flow Characteristics 中美交通流特性对比;?;?;?;?;Intersection Characteristics 交叉口特性;Pedestrian Issues (行人问题);Pedestrian Signal;;Policy and Uniformity 政策与规范;Permitted LT Display in China;;;Tianjin Chia;Beijing Chia;Shanghai Chia;Extended Left-turn Waiting Area 左转待行区;Signal Timing Terminologies 信号配时术语;Traffic Movements One-way Streets 单行线流向;;;;;;Two-Phase Operation 两相位控制;;Controlled Movements 控制流向;Conflicting Movements 冲突流向;8-Phase Quad Left Control (NEMA) 8相位左转控制;Phase, Ring and Barrier 相位,带域 和 隔断;LT Control and Phasing Sequence 左转控制和相位顺序;Phasing Sequence 相位顺序 Left-turn Leading 左转前置;Phasing Sequence Lead-Lag 一前一后;Phasing Sequence Lagging Left-Turn 左转后置;Phasing Sequence Leading LT;Phasing Sequence Lagging LT;Signal System Classification 信号系统分类;Signal Timing Process 信号配时过程;Basic Terminology 基本术语;Cycle Length and Split;;Offset 时距;Offset;Time-Space Diagram One-way Street 时距图-单行路;;Bandwidth 带宽 (Dual LT Leading)双左转前置;Bandwidth – Adjusted 调整后的带宽(Dual LT Leading);Bandwidth – Adjusted 调整后 (Lead/Lag);Time-Space Diagram Demo;Case Demo – CA 49, Auburn Before After;Case Demo – CA 49;Diamond Interchange;;;;;;;;;;Virginia Street/I-80 Signals;Freeway Interchanges;DDI;Why DDI;State of the Practice;DDI Phasing Schemes;Off-ramp Control Type;Phasing Scheme 1 (1a) 2-Stage Split with Off-ramp Overlap;Phasing Scheme 1 (1a) 2-Stage Split with Off-ramp Overlap;Phasing Scheme 1 Variation (1b);Phasing Scheme 1 Variation (1b) ;Phasing Scheme 1 Variation (1b) ;Scheme 2 2-Stage Concurrent with Off-ramp Overlap;Scheme 2 2-Stage Concurrent with Off-ramp Overlap;Scheme 3 (Reno) 3-Stage Split without Off-ramp Overlap;Scheme 3 (Reno) 3-Stage Split without Off-ramp Overlap;Scheme 3 (Reno) 3-Stage Split without Off-ramp Overlap;Scheme 4 (Gerry de Camp) 6-Stage Split with Multiple Overlaps;Scheme 5 (UNR) 4-Stage Split with Arterial Overlaps;Spotlights 新闻报道;Spotlights;News Spo

文档评论(0)

586334000 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档