DIMENSION-CONTROL-PROCEDURE(英文).docVIP

  • 8
  • 0
  • 约5.38千字
  • 约 6页
  • 2019-06-02 发布于浙江
  • 举报
INTRODUCTION This surveying procedure details the techniques and methods used to accurately measure and report the dimensional statues of the CHX module fabrication. Dimensional control shall be performed by both QC and fabrication department. The fabrication department shall ensure that the survey requests are submitted at required site. The dimensional control section shall work closely with the fabrication department at all sites of fabrication. Client shall be informed in advance of dimensional control activities. EQUIPMENT AND STANDARDS The dimensional control section shall use suitable

文档评论(0)

1亿VIP精品文档

相关文档