南湖至大花岭联络线路基填筑施工试验段技术总结-最新资料.docVIP

  • 2
  • 0
  • 约6.32千字
  • 约 26页
  • 2019-06-08 发布于浙江
  • 举报

南湖至大花岭联络线路基填筑施工试验段技术总结-最新资料.doc

南湖至大花岭联络线路基填筑施工试验段技术总结   []: Mainly introduced the data collection, collation, analysis through the test section of the entire construction process, to determine a reasonable allocation of loose laying thickness、the water content of construction control 、the compaction number of achieve compaction standard、Rational allocation of machinery and personnel, in order to guide the full range of subgrade filling construction.   [Keywords]: Test section、Loose laying thickness、Water content、Compaction number、Subgrade filling construction   一、工程概况   南湖至大花岭上行联络线工程位于武汉枢纽南端,起于洪山区南湖车站,终于江夏区大花岭车站。区间路基分为三