水电站机组一次调频与AGC性能优化
1 1 1 1 2
何常胜 , 舒荣 , 刘兴福 , 董鸿魁 , 吴永智
(1郾 云南电网公司电力研究院,昆明摇 650217;2郾 华能澜沧江水电有限公司,昆明摇 650217)
摘要: 阐述了水电站机组AGC与一次调频功能运行现状, 并对4 号机组进行试验分析, 指出机组AGC与一次调频控制
存在的配合缺陷, 并对不匹配问题进行了优化改进。
关键词: 一次调频; AGC; 景洪水电站
Optimization of Primary Frequency Regulation and AGC
in Unit of Jinghong Hydropower Station郾
1 1 1 1 2
HE Changsheng ,SHU Rong ,LIU Xingfu ,DONG Hongkui ,WU Yongzhi
(1郾Yunnan Electric Power Grid Research Institute Kunming650217 Yunnan China;
2郾Huaneng Langcang River Hydropower CO郾 , LTD Kunming650217 Yunnan China)
Abstract:The present situation of AGCandprimaryfrequency regulation intheJinghonghydropower station isdescribed, test and
Analysis on the No郾4 unit郾The unit of Jinghong hydropower station AGC and primary frequency control in the match,and the mis鄄
match problem is improved,to ensure that the AGC and the primary frequency modulation function of both the normal play a role郾
Key words:primary frequency regulation; Automatic Generation Control; Jinhong hydropower station
中图分类号: TM761郾2 TV736摇 摇 文献标识码: B摇 摇 文章编号: 1006-7345 (2014) 01-0106-04
协联关系要求, 给出能够较好解决水电站一次调
1摇 前言
频与AGC配合问题的建议。
目前, 抑制电网频率的重要措施是一次调频
2摇 机组与调速系统概述
和自动发电控制AGC (Automatic Generation Con鄄
trol) 下达的二次调频, 一次调频是指当外界负荷 某水电站安装有5 台单机容量350 MW机组,
发生变化时, 机组调速系统根据频率偏差迅速做 总装机容量1750 MW, 以500 kV及220 kV 电压
出响应, 自动地控制机组有功功率, 保持电网有 等级接入云南电网, 在系统中担负基荷、 调频、
功功率的平衡和频率的稳定; AGC下达的二次调 调峰及事故备用等任务。 调速
您可能关注的文档
最近下载
- 番茄工作法主题班会PPT课件.pptx VIP
- 精品解析:重庆市第八中学校2024-2025学年九年级上学期期末考试物理试题(原卷版).docx VIP
- 盆底肌专科护士培训讲课.pptx VIP
- 2026年1月浙江省高考(首考)英语试题(含答案详解)+听力音频+听力材料.docx
- 《涤纶长丝缝纫线》.docx VIP
- 2025年澳门初中真题下载.docx VIP
- 2025民主生活会“六个带头”个人对照检查发言提纲.doc VIP
- PTMEG产品基础知识培训.ppt VIP
- 消化内科2019年8月N3-N4理论考试.docx VIP
- FZT630122023涤纶长丝缝纫线(报批稿).docx VIP
原创力文档

文档评论(0)