建设单位加强工程造价控制与管理的方法-中英.docVIP

建设单位加强工程造价控制与管理的方法-中英.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
On the construction unit how to strengthen the project cost control and management ONE,construction phase of the project investment decision-making According to statistics, in various stages of project construction, the investment decision-making stage of the highest degree of influence of project cost can be achieved by 70% -80%. Therefore, the investment decision-making phase of cost control is to determine the basis of project cost, which directly affects the various construction phases of project cost control is reasonable. 1. Actively carry out preparatory work before the project decision-making and seriously to collect relevant information, such as equipment operation, equipment, technical parameters need to be addressed and so on. 2. According to market demand and development prospects, rationally determine the scale of construction and construction standards. 3. Science in the project-benefit analysis, preparation of project investment estimates. Investment should be based on estimates prepared, meticulous as far as possible, and seek investment estimation as comprehensive as possible from the reality, take full account of the construction process may occur in a variety of situations and adverse effects of factors on the project cost, consider the market situation and the construction period reserve price fluctuations factor, so that investment is largely in line with reality, and leave room. To make the investment to play a real control of estimating the total project investment. TWO,construction project design stage Studies have shown that engineering design fees, although it accounted for 3% of construction costs -5%, but the impact of its project cost may exceed 75%. The design phase of the project cost management is the management of the entire project cost a decisive part. 1. To develop construction project investment objectives of the plan. In the construction plans often encounter this situation: in structure, number of storeys, geological

文档评论(0)

135****7705 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档