SPC统计过程控制表格(英文版).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Factors For 3-? limits for and charts Lower Limit Upper Limit Sample Size A2 D3 D4 2 1.88 0.00 3.27 3 1.02 0.00 2.57 4 0.73 0.00 2.28 5 0.58 0.00 2.11 6 0.48 0.00 2.00 7 0.42 0.08 1.92 8 0.37 0.14 1.86 9 0.34 0.18 1.82 10 0.31 0.22 1.78 15 0.22 0.35 1.65 20 0.18 0.41 1.59 Example: We have a filling operation for a 16-oz box of cereal. The following 20 samples have been identified to build means and range control charts. Number Mean Range Number Mean Range 1 16.24 1.38 11 15.84 2.95 2 16.36 2.33 12 16.34 2.57 3 16.29 1.50 13 15.82 2.72 4 16.23 2.07 14 16.5 2.13 5 15.75 2.75 15 15.95 1.65 6 16.04 1.37 16 16.23 3.58 7 16.35 2.45 17 15.95 1.68 8 15.54 2.64 18 15.84 1.73 9 16.12 2.67 19 16.10 2.80 10 16.48 1.49 20 15.98 1.89 X = 16.1 R = 2.22 Given the following Set of Data, Determine if the process is in control. Do this for the means chart and the range chart. Sample Mean Range Sample Mean Range 1 16.2 2.0 7 16.0 2.9 2 15.9 2.1 8 16.1 1.8 3 16.3 1.8 9 16.3 1.5 4 16.4 3.0 10 16.3 1.0 5 15.8 3.5 11 16.4 1.0 6 15.9 3.1 12 16.5 0.9 Compute the Upper and Lower Control Limits from original data; 1. Means: UCL = LCL = 2. Range: UCL = LCL = Attribute Charts Using the following information, construct a control chart that will describe 95.5 percent of the chance variation. Each sample contains 100 units. Sample Defects Sample Defects 1 14 11 8 2 10 12 12 3 12 13 9 4 13 14 10 5 9 15 11 6 11 16 10 7 10 17 8 8 12 18 12 9 13 19 10 10 10 20 16 Total Number of Defects = 220 = UCL = LCL = Rolls of coiled wire are monitored using a C-chart. 18 rolls have been examined and the number of defects per roll has been recorded. Is the process in control? Use 2 standard deviation control limits. Sample Defects Sample Defects Sample Defects 1 3 7 4 13 2 2 2 8 1 14 4 3 4 9 2 15 2 4 5 10 1 16 1 5 1 11 3 17 3 6 2 12 4 18 1 Total Defects: 45 UCL = LCL =

文档评论(0)

luobin520 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档