- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3. 考试方法: 参与(包括上课出席,发言及案例讨论、分析) 20% 作业(含作业,专著 、文献阅读) 30% 期末考试 50% 运营管理(Operations Management):导论 3. 考试方法: 参与(包括上课出席,发言及专题研究或案例讨论、分析) 20% 作业(含作业,专著、文献阅读) 30% 期末考试 50% 运营管理(Operations Management):导论 For the bread-making line, baking is the bottleneck since it has the longest cycle time. The cycle time of each bread-making line is 1 hour/100 loaves. Since there are two lines, the cycle time of bread-making is 1/2 hour/100 loaves, which is shorter than the cycle time of packaging. Thus packaging is the bottleneck of the whole process and the output capacity is 133 loaves/hour (since its cycle time is 3/4 hour/100 loaves). For the bread-making line, baking is the bottleneck since it has the longest cycle time. The cycle time of each bread-making line is 1 hour/100 loaves. Since there are two lines, the cycle time of bread-making is 1/2 hour/100 loaves, which is shorter than the cycle time of packaging. Thus packaging is the bottleneck of the whole process and the output capacity is 133 loaves/hour (since its cycle time is 3/4 hour/100 loaves). Resource Utilization Packaging machine 100% Packaging operator 40/45 = 88.9% Mixer 1/2 = 50% Oven 1/(2*0.75) = 66.7% Resource Utilization Packaging machine 100% Packaging operator 40/45 = 88.9% Mixer 1/2 = 50% Oven 1/(2*0.75) = 66.7% Assume that there is no waiting, the manufacturing lead time is just the sum of all the processing times, i.e. (3/4)*3 + 1 = 3.25 hours. The actual lead time may be higher when transportation time is significant and there is waiting due to work-in-process (WIP) inventory. The same as (1) since cooling is not the bottleneck. The same as (1) since cooling is not the bottleneck. (a) Increasing the capacity of baking would not change the overall output capacity since baking is not the bottlene
您可能关注的文档
最近下载
- 全国川教版信息技术八年级上册第三单元第3节《常见的策略》教学设计.docx VIP
- 城市轨道交通概论:城市轨道交通车站PPT教学课件.pptx VIP
- JB81-1994法兰(详细规格尺寸表).pdf VIP
- 读后续写(第一次独自骑自行车)讲义-2023届高三英语写作专项.docx
- 二氧化碳致裂器安全技术要求.pptx
- (高清版)DB4401∕T 109-2021 《历史保护建筑防火技术规程》.pdf VIP
- 【新版】苏教版五年级上册科学06.热对流 教学设计含反思.doc VIP
- 小学数学北师大版六年级上册《百分数的认识》教学设计.pdf VIP
- TZS 0678—2025《生物安全实验室工作人员本底血清样本管理规范》(水印版).pdf VIP
- YY_T 1892-2024 断裂点簇集区-艾贝尔逊白血病病毒(BCR-ABL)融合基因检测试剂盒.pdf VIP
文档评论(0)