- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* * As an exercise, open an empty template, fill in the original numbers and try also alternatives 1 and 2. How was the PPM-rate in these cases ? * * * * Here is a short explanation for each box of the flow from left to right: Tolerance analysis for early concept: In the concept selection phase, different analyses might be needed in order to validate the best concept. Tolerance analysis planning: Once the project is started, the tolerances analysis issues have to be planned and aligned with the project schedule. This step can be see as the fine tuning of this flow inside the specific project. The output is the different support persons for the project, their respective tasks, the important dates (training, etc…), Tolerance analysis training: The mechanical team is trained regarding the designer level on the subject. The training material needs to be fine tuned to the project need. Together with the training a exercise session is realized with examples taken from the specific project if possible. This exercise session can be done right after the training or in a second time. Identification of critical parameters: As soon as possible, in respect with the requirements of the phone (functional, visual, assembly), the key dimensional parameters need to be identified. Their respective needed tolerance analyses are listed. The output is a preliminary list of tolerance analyses with a designer responsible for each of those. At this stage the designers can already start with their analyses. Review and prioritisation of the list: In a meeting with the “key” persons (team leader, tolerance expert, reliability expert, senior mechanical designer) the list is update and reviewed. Each analyses is ranked and the list is sorted in 2 priority levels (pre-E1 and pre-E1,5). Designer make the tolerance analyses: Once the list is completed and reviewed, each designer has a clear list of analysis to be done with the respective deadline (1st and 2nd priority). The analyses should be
您可能关注的文档
最近下载
- 定向钻穿越工程施工组织设计.doc VIP
- 2025年节能减排生态环保知识竞赛考试试题(附答案).docx VIP
- 智能网联汽车技术.pdf VIP
- DBJ/T 03-85-2018 市政基础设施工程资料管理规程(城镇道路工程、城市桥梁工程、给水排水管道工程、给水排水构筑物工程) 【压缩版】.pdf VIP
- 教科版八年级物理上册第一章~第二章综合测试题.doc VIP
- 22J403-1 楼梯 栏杆 栏板(一) (3).pdf VIP
- 学前教育学_全套PPT课件.pptx
- 光辉合益-中欧基金高管团队领导力提升项目建议书_20190515.pptx VIP
- 2025年秋新华师大版数学七年级上册全册同步教案.docx
- 《过敏性休克的临床表现与急救处理》课件.ppt VIP
文档评论(0)