CCISulzer苏尔寿汽机旁路.pptVIP

  • 23
  • 0
  • 约2.44万字
  • 约 77页
  • 2019-11-09 发布于广东
  • 举报
* * * * History: Within 2004, CCI offered standard TBBP system (the full cast NBSE55) as solution. Found, that 90% of the bypass systems in China are startup bypass with 30% capacity. Different operating conditions Low massflow Low pressure drop Conclusion : New TBBP Concept required Valve size decided through operating conditions, massflow and relatively low pressure drop – leading to rather large valve capacity requirements and big sizes Desuperheater decided through massflow, which is rather small during startup conditions – i.e. leading to a rather small desuperheater - Startup bypas

文档评论(0)

1亿VIP精品文档

相关文档