- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Public Workshop – Series #4
June 2008;Planning for Revitalization;;;Building on Past Efforts;Managing the Effort;Today’s Agenda;Community Outreach;Community WorkshopsOctober 2005 – January 2008 – March 2008;;The Wien River
Vienna, Austria
South Platte River
Denver, Colorado
Cheong Gyecheon River
Seoul, Korea
Rio Besos
Barcelona, Spain
;Denver’s Platte River and Cherry Creek have become green and accessible;Cheong Gyecheon River, Seoul Korea ;The Rio Besos in Barcelona
was similar to the LA River;Watersheds;Watershed Strategy;SCHEDULE TOPIC
October 2005 Vision, Issues Objectives
January 2008 Framework Options
March 2008 Initiate Planning Process for 5 Opportunity
Sites
June 2008 Discuss Alternatives/Present Opportunity Site Concepts
September 2008 Refine Alternatives/Opportunity Site Concepts
November 2008 Draft Revitalization Master Plan
January 2007 Final Revitalization Master Plan ;Greenway and River Opportunities;;;;;;;;;;32 Miles of Continuous Channel Improvements;Canoga Park to White Oak Blvd.;Canoga Park to White Oak Blvd.Existing Channel Section;Canoga Park to White Oak Blvd. Possible Channel Improvements;;Sepulveda Dam to Barham Blvd. Existing Channel Section;;River RestorationSepulveda Basin;Sepulveda Basin Existing Channel Section;;River Parkway;River Parkway;River Parkway;River Renaissance;River Renaissance;River Renaissance;Opportunity Sites;Site Selection Criteria;Clean Water, Flood Safety
1. Improve Water Quality
2. Recharge Groundwater
3. Retain / Enhance Flood Protection
4. Attenuate Flows;Opportunity SitesTop 9;Practicality
1. Sites that Have Strong Initial Phasing
Components
2. Sites that May Otherwise not Proceed on
their Own;Site Selection;Site Selection (cont.);Task Force Members (cont.)
Barbara Lazar–City of Burbank
Mia Lehrer–Mia Lehrer +Associates
Patty Malone–Council District 4
Ted Masigat–US Army Corps of Engineers
Gary Lee Moore–Bureau of Engineeri
您可能关注的文档
最近下载
- 中华人民共和国国歌-教案.doc VIP
- 2025年高考(全国一卷)数学试题和答案.docx VIP
- 离散数学答案(刘玉珍_编着).doc VIP
- 人民版六年级《劳动》上册全套教学课件.pptx
- 《城市规划原理》第3章 城乡规划体制.ppt VIP
- 基于SOR理论的社交网络互动对旅游行为的影响.docx VIP
- 哈曼JBL Live 770NC 无线罩耳式自适应降噪耳机 配置指南 (中国)说明书用户手册.pdf
- 《城市规划原理》第3章城乡规划体制.pptx
- 2025年最新的BRCGS包装材料全球标准第7版全套管理手册及程序文件.docx VIP
- 激光原理及应用陈家璧主编习题解答.pdf VIP
文档评论(0)