Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;Confined space 受限空间;;(2)VENTILATE the structure (after opening the inspection door or cover) 构筑物通风(在打开了检查门或盖板之后)
By opening a second inspection door or a second cover 打开第二个检查门或盖板
By fitting an extractor fan 安装抽风扇
By switching on the mechanical ventilation, if fitted 如果安装了机械通风设备,就将其打开;DO NOT ENTER THE SHAFT 不要下井
DO NOT CONTINUE WITH THE O