- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文原文
A new coal pillars design method in order to enhance safety of the retreat mining in room and pillars mines
E.Ghasemi*,K.Shahriar
Department of Mining of and Metallurgical Engineering,Amirkabir University of Technology,Tehran,Iran
Abstract:Most of the proposed methods of coal pillar design determine pillar dimensions using pillar estimation only through the tributary area theory.Designing pillar based on these methods is not appropriate in room and pillar mines with pillar recovery because retreat mining and gob creation generate abutment loads.Neglecting abutment loads in design stage may lead to pillar failure and destructive effects during retreat mining.Thus proper pillar design has a remarkable effect on mining effect on mining safety.In this paper,a step-bu-step method is presented to design pillars with square shape in room and pillar mines with regard to existing pillars in the active mining zone(AMZ) and estimating abutment loads according to experiment-method. This method has been applied to determine optimum pillar dimensions in the main panel of Tabas Cental Mine(TCM),located in the mid-eastern part of Iran.Obtained results show the abutment loads account for 27%of the total loads applied on pillars in AMZ in this panel.Pillar width,based on this method, is also obtained 11.6m.
Key words: Pillar design;Room and pillar;Retreat mining; Active mining zone;Abutment loads
Introduction
In underground coal mining ,room and pillar is the method of working preferable for flat,tabular deposits in thin seams,where rooms of entries are driven in the solid coal to form pillars in the development panels(Hustrulid,1982;Hartman,1978).Pillars o f coal are left behind to support the roof and prevent its collapse,thereby allowing miners to extract coal between them and to travel safely. In some cases, the pillars are removed partly or fully in a later operation, known as retreat mining(also known as secondary mining or pillar recovery operation). Coal mine pillar desi
您可能关注的文档
- 数控机床改造外文文献翻译、中英文翻译.doc
- 数控机床进给运动连杆机构减速器齿轮箱间隙减小系统外文文献翻译、中英文翻译.docx
- 数控技术发展趋势外文文献翻译、中英文翻译.doc
- 数字控制外文文献翻译、中英文翻译.doc
- 双室连接非对称液压缸的位置控制外文文献翻译及中英文翻译.doc
- 双作用液压缸的结构设计开题报告及文献综述.doc
- 双作用液压缸的结构设计任务书.doc
- 双作用液压缸的结构设计说明书.doc
- 水陆两用摩托艇设计答辩PPT.pptx
- 水陆两用摩托艇设计开题报告及文献综述.doc
- 浙江2025学年第一学期高三12月适应性联考日语含答案.doc
- 江苏省镇江市2025-2026学年高三上学期12月期中质量监测语文试题及参考答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考英语含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考政治含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考语文试题含答案.doc
- 浙江2025学年第一学期高三12月适应性联考地理含答案.doc
- 浙江2025学年第一学期高三12月适应性联考历史含答案.doc
- 山东省实验中学2025-2026学年高三上学期第三次诊断性考试数学含答案.doc
- 山东省实验中学2025-2026学年高三上学期第三次诊断性考试物理含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考数学试题含答案.doc
原创力文档


文档评论(0)