安定垃圾填埋气回收利用项目_图文.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Anding Landfill Gas Recovery and Utilisation Project Beijing, PR China Project Design Document Project Owner: Beijing Erqing Environment Engineering Group PDD by page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT (CDM-PDD Version 02 - in effect as of: 1 July 2004 Introductory Note 1. This document contains the clean development mechanism project design document (CDM-PDD. It ela borates on the outline of information in Appendix B “Project Design Document” to the Modalities and Procedures (decision 17/CP.7 contained in document FCCC/CP/2001/13/Add.2. 2. The CDM-PDD can be obtained electronically through the UNFCCC CDM web site (/cdm, by e-mail (cdm-info@ or in printed from the UNFCCC secretariat (Fax: +49-228-8151999. 3. Explanations for project participants are in italicized font. 4. The Executive Board may revise the project design document (CDM-PDD, if necessary. Revisions shall not affect CDM project activities validated at and prior to the date at which a revised version of the CDM-PDD enters into effect. Versions of the CDM-PDD shall be consecutively numbered and dated. 5. In accordance with the CDM MP, the working language of the Board is English. The CDM-PDD shall therefore be submitted to the Executive Board filled in English. The CDM-PDD format will be available on the UNFCCC CDM web site in all six official languages of the United Nations. 6. The Executive Board recommends to the COP (COP/MOP to determine, in the context of its decision on modalities and procedures for the inclusion of afforestation and reforestation activities in the CDM (see also paragraph 8-11 of decision 17/CP.7, whether the CDM-PDD shall be applicable to this type of activities or whether modifications are required. 7. A glossary of terms may be found on the UNFCCC CDM web site or from the UNFCCC secretariat by e-mail (cdm-info@ or in print (Fax: +49-228-815 1999. page 2 CONTENTS A. General description of project activity B. Application of a baseline methodology C. Duration of

文档评论(0)

3344483cc + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档