- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
let it go
The snow glows white on the mountain tonight
Not a footprint to be seen
A kingdom of isolation,
and it looks like Im the Queen
The wind is howling like this swirling storm inside
Couldnt keep it in; Heaven knows Ive tried
Dont let them in, dont let them see
Be the good girl you always have to be
Conceal, dont feel, dont let them know
Well now they know
Let it go, let it go
Cant hold it back anymore
Let it go, let it go
Turn away and slam the door
I dont care what theyre going to say
Let the storm rage on
The cold never bothered me anyway
Its funny how some distance
Makes everything seem small
And the fears that once controlled me
Cant get to me at all
Its time to see what I can do
To test the limits and break through
No right, no wrong, no rules for me,
Im free!
Let it go, let it go
I am one with the wind and sky
Let it go, let it go
Youll never see me cry
Here I stand
And here Ill stay
Let the storm rage on
My power flurries through the air into the ground
My soul is spiraling in frozen fractals all around
And one thought crystallizes like an icy blast
Im never going back, the past is in the past
Let it go, let it go
And Ill rise like the break of dawn
Let it go, let it go
That perfect girl is gone
Here I stand
In the light of day
Let the storm rage on
The cold never bothered me anyway!
人防验收注意事项
主体结构人防工程验收应具备的条件:
人防工程主体结构技术资料上报;
现场应具备的条件(地面无积水,干燥;顶板、剪力墙部位无渗漏水;建筑垃圾要清理干净);
梁、柱、剪力墙蜂窝、孔洞要清凿到位,不得修补;
预埋管四周要清理干净,不得封堵;
柱、剪力墙的对拉螺栓端头要切割处理(螺栓要进墙柱砼表面1cm,垫片要凿除);
所有的人防门框要依顺序编号,每个门框要检查垂直度偏差情况,要有检查记录;门框垂直度偏差超出1 cm的要返工处理,监理单位及施工单位要签字盖章确认;
人防门密闭情况要经过第三方单位检测(2015年5月1日报建项目开始执行)。
人防工程竣工验收应具备的条件:
主体结构验收所需要的条件都应具备;
除尘滤毒室要安装插座,过滤吸收器可以不安装,支架要制作;
人防通道部位、滤毒室、洗消室等在防护门和密闭门之间的房间要用水泥浆批平整,严禁批白;
所有的人防整改单要提供;
文档评论(0)