- 217
- 0
- 约3.07万字
- 约 19页
- 2020-11-03 发布于浙江
- 举报
PREDETERMINED TIME SYSTEMS
1.1 Introduction
There are a number of methods that can be used to
calculate the time needed to carry out a job or a task.
Time standards can be established by time study, by work
sampling, or by the use of predetermined times.
What does a predetermined time system consist of?
A predetermined time system consists of a set of time data
and a systematic procedure which analyses and
subdivides any manual or human task into motions, body
movements, or other elements of human performance,
and assigns to each the appropriate time value.
Prede
您可能关注的文档
最近下载
- 英语不规则动词过去式.pdf VIP
- 道路毕业设计说明书含图纸 (1).docx
- 火电检修工程全过程规范化管理0805华电集团.pdf VIP
- 高教中职职高数学基础模块上册课件.pptx
- 仓储系列《林德平衡重叉车335-03AC故障代码》.pdf VIP
- nts-130系列数显电测表v1.0技术说明书.pdf VIP
- 仓储系列《林德平衡重叉车324-02维修说明书》.pdf VIP
- TesseralPro手册(中文版)[整理].pdf VIP
- 降低透析患者透析中低血压发生率的品管圈项目汇报.pptx VIP
- 广东省深圳市南山区2025-2026学年八年级上学期期末学业质量评估语文试卷 (含答案).docx VIP
原创力文档

文档评论(0)