轮机员英语面试(轮机长、大管轮、二管轮、三管轮适用).docxVIP

轮机员英语面试(轮机长、大管轮、二管轮、三管轮适用).docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
轮机员英语面试(轮机长、大管轮、二管轮、三管轮适用) 1、Can you measure oil level? Which method is right, to measure ullage height or to measure oil depth? Both will do. In practice, to measure ullage height is more specific than to measure oil depth. To measure ullage height, we should know the standard height of oil tank. In common practice, we usually measure the oil depth. 2、Could you tell the working parts of a gas welding gun? Yes, sir. The working parts include nozzle, oxygen valve, acetylene valve, oxygen supply, acetylene supply. In addition, filler rod is used to fill in welded joint when it melts. 注:焊枪是轮机部常用的维修工具,工作时这些部件名称经常涉及到。 3、How to pump out bilge water in the engine room? Pump bilge water into sludge tank. Then pump bilge water into oily water separator. Enquire master or deck officers on duty to pump out at appropriate water. The proportion should not beyond 15 PPM.机舱排污水程序可表述为把污水排到污水集中柜内,再通过油水分离器在允 许排放区域按含油量小于 15 PPM 排放。 4、When will an Engineer Officer in charge of watch call Chief Engineer? When engine damage or malfunction occurs which may be such as to endanger the safe operation of the ship; when any malfunction occurs which it is believed, may cause damage or break down of propulsion machinery, auxiliary machinery or monitoring and governing systems; and in any emergency or if in any doubt as to what decision or measure to be taken. 5、What must be handed over to relieving Engineer Officer at transition of change command? If possible, the condition and mode of operation of automatic boiler controls such as flame safeguard control systems, limit control system, combustion control system, fuel-supply control systems, and other equipment related to the operation of steam boilers; and potentially adverse conditions due to bad weather, ice, contaminated or shallow water; any special modes of operation dictated by equipment failure or adverse ship conditions; reports of engine-room ratings relating to their assigned duties; the availability of fire-fighting appliances; the sta

文档评论(0)

capt + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档