管井降水施工方案
The con structi on scheme of tube well dewateri ng
—柬埔寨安达都会广场项目
——VCLP PROJECT
CAMBODIA
编制单位:Si noma Han Dan Co nstruction Co., Ltd
编 制:
compiled:
审 批:
Verified:
批 准:
Approved:
日 期:
Date
安达广场基坑降水施工方案
Con structi on Scheme for Foun dati on Pit Drawdow n
of VATTANAC Park
一、降水设计方案
Drawdown design scheme
1.1、设计参数
Desig n data
本工程降水井采用直径300mm波纹管滤管,管井共20根井深
22米,井口外露 500mm。
300mm corrugated filter pipe is adopted as the drawdow n well and there are total 20 wells of 22m deep each. The wellhead exposes by 500mm.
1.2、降水井平面布置
2. Layout of drawdow n well
降水井布置详见降水管井平面布置图。
The arran geme nt of drawdow n well is show n on the layout of drawdow n well.
二、施工准备
Construction preparation
2.1、 测量放线
Survey ing and sett ing out
测量放线依据现场测量控制点,标高采用水准仪,并根据井点 布置图采用全站仪放线定位。放线经复核后报管理公司确认方可进 行施工。
The surveying and setting out shall be based on the field survey con trol points and optical level shall be used for measuri ng the elevati on. In additi on, the total stati on in strume nt shall be used for the setting out and positioning according to the layout of well points. Setting out shall be performed after re-recheck and being reported to the man ageme nt compa ny for con firmati on.
2.2、 施工用电、用水配置
2.2 Electricity and water for construction
1、施工用电直接从配电房接入,50kVA能完全满足降水用电负 荷。
The electricity for construction shall be directly connected from the switchgear room, and 50kVA can fully meet the drawdow n load requireme nts.
2、 依据用水设备和施工经验,需用水量10m3/h直径50mm管, 就能满足施工用水。
Depending on the water equipment and based on the con structi on experie nee, the pipe of diameter 50mm with a water flow rate of 10m3/h can meet the con structi on requireme nts.
2.3、打井机械及井点设备
Well drilling rig and well point equipment
打井机械可根据工期要求变更。井点设备是由井点管、连接 管、排水主管及抽水设备等组成。具体如下:
The well drilling rig may very according to the schedule requireme nt. The well point equipme nt con sists of well point pipe, conn ect ing pipe, drain header and pump ing equipme nt. The details are as follows:
机械设备表
List of mecha ni cal equip
您可能关注的文档
最近下载
- 2024党支部工作制度汇编(范本).docx VIP
- 高架桥道路施工组织设计方案.pdf VIP
- HJ84-2016《水质无机阴离子(F-、Cl-、SO42-)的测定离子色谱法测定方法确认-备份.pdf VIP
- 简约PPT模板红色简约风感动中国十大人物介绍.pptx VIP
- 西安工程大学821空气调节考研真题试题2016—2020年.pdf VIP
- “东来顺”与“涮羊肉”.doc VIP
- 微波技术基础-(廖承恩-著)-西安电子科技大学出版社-课后答案.pdf VIP
- 室内装饰用PVC膜标准 T/ZZB 1780-2020.pdf VIP
- 二次函数新定义型综合问题(四大题型)(学生版)-2025年中考数学.pdf VIP
- 云南省市政基础设施工程施工质量验收统一规程DBJ53T-36-2011.pdf VIP
原创力文档


文档评论(0)