- 1、本文档共45页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * * 中东石油智库 * Example problem for Wait Weight Method Hole: TVD 12,550ft, size 8.75 in. Drill pipe: 5 in., 19.5 ppf, XH Casing: 95/8 in. 53.5 ppf, TVD 9,500 ft KRP: 850 psi @ 30 spm Pump: 53/4 × 12 P-160 triplex SIDPP: 520 psi, SICP: 750 Pit gain: 38 bbl Mud weight: 14.5 ppg 中东石油智库 * Volumetric Method Is sometimes used for controlling bottomhole pressure when no drill pipe is in the hole or when the well cannot be circulated. It can also be used when the well is closed in the crew is waiting on orders or equipment, or it can be employed when stripping in or out of the hole. 中东石油智库 * Volumetric Method Its not a well-killing method in the sense of being a method of circulating, since it simply coordinates the increase or decrease of annular pressure with the amount of mud displaced from the hole. 中东石油智库 * Volumetric Method The basic premise of the volumetric method is that each barrel of mud contributes a certain pressure to the bottom of the hole, which may be measured in psi per barrel. If 1 bbl of fluid is bled off, bottomhole pressure is reduced by the amount of pressure exerted by that 1 bbl. psi/bbl of mud = (MW ×0.052) ÷ AC ppg bbl/ft 中东石油智库 * Procedure for Volumetric Method Record SICP. Rig up a choke line output to discharge fluid into a tank. The tank must be graduated so that fluid can be accurately measured to the nearest gallon. Calculate the psi / bbl of fluid bled from or added to the well. 中东石油智库 * Procedure for Volumetric Method 4) Monitor SICP allow it to increase 100 psi, this increase occurs as the gas bubble migrates up the hole. 5) Bleed a small amount of mud-1/4 bbl, or about 10 gal- from the well. Be sure to accurately measure the amount of mud bled. 中东石油智库 * Procedure for Volumetric Method 6) Record the reduction in SICP when the mud is bled. 7) Calculate the reduction in bottomhole pressure caused by bleeding the mud. 8) If the reduction in bottomhole pressure is less than 100 psi, repeat step 5 until a red
文档评论(0)