焊接通用要求.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
焊接通用要求 Welding procedure together with the relevant procedure qualification and non-destructive testing procedure shall be provided for pressure vessels. Heat treatment procedure may be indicated in the welding procedure or submitted as separate documents. Welding procedure and welder’s qualification shall be according to ASME code. Welding shall be performed by qualified welders using qualified procedures and test and inspection shall be performed by qualified inspectors using qualified procedures, according to applicable ASME code. The identification of the welders must be applicable for the following critical piping: HP steam pipe (from(SH) outlet to ST HP stop valve); Low temperature reheat steam pipe (from ST HP exhaust to (RH) inlet); High temperature reheat steam pipe (from (RH) outlet to ST RSV). The welding material shall be similar to the mother material according to applicable code. Welding plant and ancillary equipment shall be in accordance with the appropriate parts of BS 638 or equivalent international standard. The area of the temporary welded attachments shall be examined according to applicable code if the parts will be used as removed. The material composition to be welded shall be according to applicable material code. Preheat condition for shop and field welding shall be in accordance with applicable code. NDT of castings, wrought products and welding shall be carried out in accordance with the applicable material code/standard or British Standard. NDE procedure for the owner’s witness items shall be submitted for approval. SNT-TC-1A shall be applied for NDE operator/inspector qualification. NDE operator shall be Level I, and inspector shall be Level II. During the detailed design stage, the boiler manufacturer shall submit for approval the welding procedure specification (WPS) and procedure qualification records (PQR’s) and heat treatment procedure for the critical components which are listed below.(卖方负责自己供货范围内焊缝) HP steam pipe (from (SH) out

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档