- 1、本文档共50页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
房地产知识 200 问
temporary construction organization design requires the
implementation of the overall layout. 2 site near the high voltage line
protection near power lines to have a reliable protective measures
protective closely, to meet safety requirements. 3 branch set up
distribution box into outlet sleeve and a cross arm to be used; Access
to wires neatly, reasonable matching; Prohibited the use of insulation
is poor, aging skin, broken wires, to prevent leakage; Should be fixed
by insulators, and overhead laying; Line the hallway to have a reliable
protection; Direct buried lines, laying depth of not less than 0.6m,
leads to the ground from the 2m height to the ground at 0.2m, you must
set up protective casing. 4 spot lights hand-held lamp 36V safe voltage
should be used; 36V safety at hazardous voltages, particularly in
hazardous areas using 12V; Lighting wires should be fixed on the
insulators; Insulated rubber sheathed cable for field lights, lighting
the use of sheathed wires; Lighting circuits and lighting from the
ground not less than the prescribed distance, prohibited the use of
electric arc furnace; To prevent the wire insulation is poor, aged,
broken skin and leakage, with tungsten heating is strictly prohibited. 5
to set up low-voltage lines are not allowed to use bamboo poles, pole
cross arm should be established and insulators; Fine wires can not be
mounted on scaffolding or tree branch; Overhead lines required high
enough off the ground. 6 electric ... Project name: 5-5-2 sequential
order of the subsidence observation observation point number support
(supporting) and diagrams year month day year month day year month Day,
the distance (m) deformation (mm) the relative distance (m) deformation
(mm) the relative distance (m) deformation (mm) today this this this
this cumulation Engineering formwork supporting system self-test State
observer records form template project nam
您可能关注的文档
- 电源转换器产品研发流程图资料.pdf
- 多元线性回归Wald检验.pdf
- 法律的自我复制及其限制.pdf
- 电气安全管理程序.pdf
- 二年级数学口算练习题.pdf
- 东北农业大学博士后进站面试考核表.pdf
- 二年级上册表内乘法口算练习题.pdf
- 用于肝性脑病的镇静药.pdf
- 儿童疫苗接种时间表一二类疫苗资料.pdf
- 电机学考试资料真题2(感应电机含答案)资料.pdf
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)