标段冬季临时采暖施工方案
标段冬季临时采暖施工方案
标段冬季临时采暖施工方案
目
录
1.
工程简况 ·························
2
2.
天气装况 ·························
2
3.
工程范围 ·························
2
4.
方案编制依照 ·······················
2
5.
编制原则 ·························
2
6.
作业进度及劳动力安排 ···················
2
7.
作业准备工作及条件 ····················
3
8.
采暖系统施工方案的确定及施工方法
·············
4
9.
暂时采暖系统所需设备资料明细表
··············
5
10. 应急举措 ························
9
11. 作业质量要求 ······················
9
环境管理 危险点、危险源剖析及防备举措 ·········· 10
安全技术防备举措 ···················· 11 14.危险点、危险源剖析及防备举措 ·············· 11
工程简况
因为整体工期提早的原由,神华新疆准东五彩湾电厂一期 2×350MW发电工程部分施工
1/