A13主要施工设备进场报审表.docxVIP

  • 3
  • 0
  • 约1.02千字
  • 约 1页
  • 2021-12-08 发布于山东
  • 举报
A13主要施工设施进场报审表 A13主要施工设施进场报审表 A13主要施工设施进场报审表 主要施工设施进场报审表 SH/T 3903-A.13  工程名称 Works Title : Major Construction Equipment Mobilization Approval Request 编号 Item No : 致 (监理单位) To ( CS/CMC ) 我方肩负的 工程,按合同规定的主要施工设施、机具及检测设施、工具拟进场,并经 自检合格,请检验。 We contracted the works, we are going to mobilize the major construction equipment and tools as well as the inspection equipment and tools specified by the contract, after the self inspection, they are on spec, please inspect. 附 Attached : 项目经理 Project manager 承包单位(章) 日 期 Contractor( Chop) Date 审察建议 Review comments : 经检查上述施工设施、机具及检测设施、工具, 切合 / 不切合施工组织设计文件和有关要求, 允许 / 禁止许进场。 According to our inspection, the above equipment, tools and the inspection equipment and tools meet/ do not meet the requirements of the construction organization design documents and other rules, site mobilization allowed / site mobilization not allowed. 禁止许进场原由以下: The reasons for not allowing site mobilization are listed below : 总 /专业监理工程师 Chief/discipline supervision engineer 项目监理机构 日 期 CS/CMC Date

文档评论(0)

1亿VIP精品文档

相关文档