IBM-新奥燃气控股集团—SC4BFinalProposalclean1[1].pdfVIP

IBM-新奥燃气控股集团—SC4BFinalProposalclean1[1].pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Version v1.1 October 05 STANDARD CONDITION 4B OF THE GAS TRANSPORTER TRANSMISSION LICENCE NATIONAL GRID NTS STATEMENT OF PRINCIPLES AND METHODS TO BE USED TO DETERMINE CHARGES FOR NATIONAL TRANSMISSION SYSTEM CONNECTION SERVICES Publication date –[ ] 2005 Effective date –[ ]2005 Introduction This Statement applies to charges determined from the Statement Effective Date and remains effective until superseded by any future Statement, which will be furnished to the Authority and published. It also provides information in support of National Grid NTS’ Ten Year Statement in respect of National Transmission System connections. This Statement applies exclusively to connections to, modification of, disconnection of, or diversions of sections of, the National Transmission System (NTS). Distribution Network (DN) owners (including National Grid plc in its capacity as a DN owner) publish similar statements and the reader is advised to refer to the relevant statement and contact the relevant DN owner regarding works that may involve connections to, modification of, disconnection of, or diversions of sections of any relevant DN pipes. This is a Statement of the principles on which, and the methods by which, National Grid NTS will determine from the Effective Date the charges specified in Standard Condition 4B of its Gas Transporter Licence. This statement is complimentary to National Grid NTS’ Incremental Entry Capacity Release (IECR) methodology statement, which details the criteria by which National Grid NTS would release any incremental entry capacity above the previous obligated levels in accordance with National Grid NTS incentives.

文档评论(0)

zyl401277391 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档