GBT 257392010 核电厂阀门调试技术导则.docxVIP

GBT 257392010 核电厂阀门调试技术导则.docx

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
ICS 27.120.99 F 69 National Standard of the People’s Republic of China GB/T 25739—2010 Technical Guideline of Valves Commissioning for Nuclear Power Plant Issued on December 23, 2010 Implemented on May 1, 2011 Issued by General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of China and Standardization Administration of the Peoples Republic of China GB/T 25739-2010 PAGE 13 GB/T 25739-2010 PAGE 2 Technical Guideline of Valves Commissioning for Nuclear Power Plant Scope This Standard stipulates the commissioning method, test requirements and acceptance criteria for the safety and non-safety electric isolation valves, pneumatic isolation valves, electric regulating valves, pneumatic regulating valves and manual isolation valves of the nuclear power plant. This Standard applies to the onsite commissioning of the valves of nuclear power plant. Terms and definitions The following terms and definitions are applicable in this document. Actuator A driving device which operates the valve and connects the valve body; this device can adopt electric, pneumatic or combined mechanism. Its movement can be controlled via stroke, torque, thrust or their combinations. Valve remote controls A mechanical force transfer mechanism that transfers the force of the valve actuator or hand wheel to the remote valve stem to open or close the valve (also called valve remote transfer mechanism). No-load test The action test of the valve when there is no medium. Load test The action test of the valve under the medium pressure and system running conditions; Commissioning Commissioning of electric isolation valve Commissioning preconditions The commissioning personnel shall have received the electric isolation valve commissioning skill training and have the corresponding qualifications and authorizations. The instruments and meters used for the commissioning shall pass the relevant inspections and tests and are still in their servi

文档评论(0)

1243595614 + 关注
实名认证
文档贡献者

文档有任何问题,请私信留言,会第一时间解决。

版权声明书
用户编号:7043023136000000

1亿VIP精品文档

相关文档