- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国家大剧院英文导游词
National Grand Theatre Beijing, China
National Grand Theatre takes a photo:
Next, lets take you to see the National Grand Theatre, the largest dome in the world-national centre for the performing arts, which attracts worldwide attention.
The National Grand Theatre is located on the west side of the Great Hall of the People, covering an area of 118,900 square meters. It was designed by Paris Airport Company of France, with the cooperation of Tsinghua University, and was designed by Paul Andrew, a famous French architect, with a total construction area of about 165,000 square meters.
Andrew described his grand theatre scheme as Fairy Pavilion on the Lake. This is an ellipsoidal building located in a large nearly square pool, which can be used as an ice skating rink in winter. The main entrance of the Grand Theatre is in the north, which is connected with the exit of the subway. The glass roof of the passage is the bottom of the pool, so the audience can experience the wonderful feeling of walking under the water before entering the theatre.
The theater contains an opera house with a capacity of 2,500 people, a concert hall with a capacity of 2,000 people, a small theater with a capacity of 1,200 people and a small experimental theater. Other supporting facilities include: art gallery, performing arts research and exchange department, art shop, underground parking lot, etc. Surrounded by pools on all sides, the National Grand Theatre building is novel in shape, avant-garde and unique in conception, which embodies the characteristics of the world landmark buildings in the 21st century as a whole. The estimated total investment of the project is 2.688 billion yuan, and the construction period is 4 years.
The most distinctive feature of the National Grand Theatre is the design in front of the door. Everyone can experience its ingenious design and mystery later!
您可能关注的文档
最近下载
- 河南省洛阳涧西区2022—2023学年七年级下学期期中考试语文试卷.docx VIP
- 2024年全国高考数学真题分类(函数与导数)汇编(附答案).pdf
- 奥维互动地图在线路勘测中地应用.docx
- 河南省洛阳市涧西区2023-2024学年七年级下学期期中考试语文试卷(含答案).pdf VIP
- 中国盐业集团有限公司招聘笔试题库2022.pdf
- 2023年福建考评员考试答案.docx VIP
- 英语中考短语大全.doc VIP
- 2024《企业盈利能力分析的国内外文献综述》2400字.docx VIP
- 蓝碳生态系统碳汇计量监测技术规程.pdf VIP
- 2025年开封文化艺术职业学院单招职业适应性测试题库及答案一套.docx VIP
文档评论(0)