大体积混凝土专项施工方案编制指南
工程名称:
文件编号:
发布日期:执行日期:
目录
一、编制说明·························1
1.1编制依据·······················1
1.2编制人员·······················1
1.3发放范围·······················1
二、工程概况·························2
2.1工程总体概况·····················2
2.2大体积混凝土概况···················2
2.3施工平面布置·····················3
2.4施工要求和技术保证条件················3
三、施工计划·························5
3.1施工进度计划·····················5
3.2劳动力配置计划····················5
3.3材料配置计划·····················5
4.4设备配置计划·····················5
四、施工管理及作业人员配备和分工···············7
4.1施工管理人员·····················7
4.2专职安全管理人员···················7
4.3特种作业人员·····················7
4.4其他作业人员·····················7
五、深化设计·························8
5.1冷却水管布置·····················8
5.2测温元件布置·····················9
5.3钢筋支架布置·····················10
六、施工工艺技术······················12
6.1技术参数·······················12
6.2施工工艺流程·····················12
6.3施工方法·······················12
6.4检验试验计划·····················16
七、验收要求························18
7.1验收标准·······················18
7.2验收程序·······················18
7.3验收内容·······················18
7.4验收人员·······················18
八、施工保证措施······················19
8.1质量保证措施·····················19
8.2安全保证措施·····················20
8.3文明施工保证措施···················20
8.4环境保证措施·····················20
8.5进度保证措施·····················21
8.6应急保障措施·····················21
8.7季节施工保障措施···················21
九、计算书·························23
9.1混凝土泵输出量和所需搅拌运输车数量计算········23
9.2大体积混凝土温度应力与收缩应力计算··········23
9.3大体积混凝土表面保温层计算··············23
十、附件··························24
一、编制说明
1.1编制依据