棚洞施工过程分析及应用.pdfVIP

  • 9
  • 0
  • 约1.19万字
  • 约 5页
  • 2017-09-14 发布于安徽
  • 举报
第 28卷第 4期 重庆交通大学学报 (自然科学版) Vo.l 28 No. 4 2009年 8月 JOURNALOF CHONGQ ING JIAOTONG UN IVERSITY(NATURAL SCIENCE) Aug. 2009 1 高 峰, 伍臣宇 (, 400074) : , ANSYS , DP , , , , , , : ; ; ; : U45 1 1 : A : 1674 0696( 2009)04 0680 05 Investigation on Construction Process of Shed-Tunnel and ItsApplication 库 GAO Feng,WU Chen-yu 例 ( SchoolofCivilEngineering Architecture, Chongqing JiaotongUniversity, Chongqing 400074, China) Abstract: A ccording to one tunnel adjacent tomountain at eastern mountainous area in Jilin province, the construction 案 process of shed-tunnel is simulated by the finite element softwareANSYS. ByvirtueofDrucker-Prageryield criterion to ana- lyze the elastic-plasticity, and using / live0 or / dead0 attributes of theelements, the process ofexcavation of slope, construc- E tion of shed-tunnel and backfilling is simulated. The status of stresses and deformation of shed-tunnel structure is re- A searched. The questions should bepaid attention to in the construction process of shed tunnel are pointed out. Furthermore, C The shed-tunnel structure and gradient of backfilling are optim ized. The results show that shed-tunnelw ith inclined column and sem-i arch ismore reasonable than thatw ith straight column and sem-i arch in structure, and different gradient of back- filling has great impact on stresses of shed-tunnel structure, which provides re

文档评论(0)

1亿VIP精品文档

相关文档