优秀土木工程专业毕业论文,是顺利答辩过论文资料,精品设计,欢迎参考下载!!!
摘 要
A江是我国东南地区的一条河流,根据流域规划拟建一座水电站。
A江水利枢纽同时兼有防洪、发电、灌溉、渔业等综合作用,水库正常蓄水位183.75m,设计洪水位186.7m,校核洪水位189.80m,汛前限制水位182m,死水位164m,尾水位103.5m。水库死库容 4.76亿m3,总库容9.6亿m3。
A江水利枢纽工程等别为一等,工程规模为大(1)型工程,主要建筑物级别为1级,次要建筑物级别为3级,临时性建筑物级别为4级。
A江水利枢纽的主要组成建筑物有厂房泄水建筑物过木筏道等。m,高m,进口底高程为164m,出口底高程为154m;中孔位于水电站进水口两侧,孔口宽m,高m,进口底高程为135m,出口底高程为130m。泄槽支撑结构采用框架式结构。坎顶高程为11m,浅孔反弧半径为中孔反弧半径为m。泄槽直线段的坡度与孔身底部坡度一致,挑射角θ=o,导墙厚度为1m, 浅孔导墙高度为m,中孔导墙高度为m。4台5万k的发电机组,主厂房长81m,宽18m,副厂房长6m,宽10m,安装场长21m,宽18m。Abstract
A jiang is a river which lies in southeast of China.According to drainage area programming,a water power station is planning to built on it . A jiang hydrocomplex plays an important parts in flood control ,waterpower, irrigation, fishery and so on.
The reservoir normal water level is 183.75m,design flood level is 186.7m,maximum flood level is 189.80m,flood control level is 182m,dead water level is 164m, tailwater level of hydropower station is 103.5m.The dead reservoir capacity is 476,000,000m3,and the total reservoir capacity is 960,000,000 m3.
The hydraulic engineering grade is Grade I. The key 、secondary and temporary structures’ grade is Grade I、III and IV.
The key hydroproject is consist of water retaining structure,power house,auxiliary room,sluice structure,raft sluice,and so on.
The water retaining structure is a double curvature arch dam.The length of the axis of crest dam is about 312m.Maximum height of the dam is 100.4m,the thickness of the bottom of the dam is 25.7m,and the width of the top of the dam is 8.5m.
In this design, we use two different methods to calculate the stess of the arch dam in four status.One is using program ,the other is using crown cantilever method to calculate.
The release structure is comprised of 2 mid-level outlet and 2 short-level outlet.The width of the short-level outlet is 8.5m,and the height is 8.0m;the width of the mid-level outlet is 7.5m,and the height is 7.5m.The upstream and the downstream side of every outlet are a bulkhead gate and a operating gat
您可能关注的文档
最近下载
- 《SBT 11164-2016绿色仓库要求与评价》(2026年)实施指南.pptx VIP
- 宿迁思睿屹新材料有限公司年产3000吨2羟基6萘甲酸项目环境影响修编报告书.pdf VIP
- 金智学工管理系统功能白皮书.pdf VIP
- 2025年度医院党支部组织生活会临床医生个人对照检查材料.doc VIP
- 环境影响评价报告公示:新建热处理淬火、处理金属表面发黑项目环评报告.pdf VIP
- 译林版英语七年级上册首字母(短文篇).pdf VIP
- 《经颅电刺激技术在精神障碍临床应用中的操作规范》.docx
- 2025年福建省宁德市中考数学试卷真题(含标准答案).docx
- GB51110-2015:洁净厂房施工及验收规范.pdf VIP
- 核反应堆设计软件:FLUKA二次开发_(2).FLUKA二次开发环境搭建.docx VIP
原创力文档

文档评论(0)