压力打桩:在打桩过程中的土地震动和噪声污染外文翻译.docVIP

压力打桩:在打桩过程中的土地震动和噪声污染外文翻译.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文论文翻译 英文原文 Press-in piling: Ground vibration and noise during pile installation David White*, Tim Finlay**, Malcolm Bolton*** and Grant Bearss**** * Research Fellow, Cambridge University Engineering Department, Trumpington Street,Cambridge, CB2 1PZ, UK. e-mail: djw29@eng.cam.ac.uk ** MEng student, Address as above, e-mail: tcrf2@eng.cam.ac.uk *** Professor of Soil Mechanics, Address as above, e-mail: mdb@eng.cam.ac.uk **** Vice-President of Operations, Giken America Corporation, 5802 Hoffner Avenue, #707, Orlando, Florida 32822, U.S.A. e-mail: gbearss@ Abstract Conventional dynamic piling methods are ill-suited to the urban environment. The press-in meth- od offers an alternative technique of pile installation, which allows pre-formed piles to be installed with minimal noise and vibration. Field measurements of noise and ground vibrations during press-in piling are presented and com- pared to existing recommended limits. Based on this initial database, tentative prediction curves are presented. Equipped with these tools, designers can assess the relative environmental impact of eac- h installation method when planning piling works. Introduction Pile driving is an activity that is ill-suited to the urban environment. The noise and ground vibrat- ions created during the installation of pre-formed piles by dynamic methods can lead to human dist- urbance and structural damage. Stringent regulations now virtually preclude the installation of steel tubular piles by dynamic methods in urban Europe, and bored cast-in-place piles have become the most common design solution. Steel tubular piles offer a number of advantages over bored piles, particularly relating to issues of sustainability (Table 1). The embodied energy of a pile is the sum of the energy required to extract the raw materials, carry out any manufacturing or construction processes, and transport the material between and within these processes. A steel pile contains less embodied energy than a concrete pile o

您可能关注的文档

文档评论(0)

嫣雨流纱 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档