Abstract
This graduation design thesis is on safety pre-evaluation for the plastic mold cityof Shenyang Baoping, Base on the project feasibility report, all the potential dangerous and harmful factors of the project are identified and analyzed. According to Guidelines for safety assessment prior to startAQ8002-2007, evaluation units are divided. Aiming to major risk and hazard factors, Safety Check, Preliminary Hazard Analysis PHA and Fault Tree Analysis FTA are used to do safety assessment qualitatively or quantitavely. Aiming at these risk and haz