36 7 Vol. 36 No. 7
2012 7 Power System Technology Jul. 2012
1000-3673201207-0176-08 TM 615 TM 743 A 470·4054
1 1 1 1 2
1 710049
2 ST17 4LX
Analysis on Fault Features of Wind Turbine Generators Concentratedly
Connected to Power Grid
1 1 1 1 2
ZHANG Baohui , WANG Jin , LI Guanghui , HAO Zhiguo , BO Zhiqian
(1. School of Electrical Engineering, Xi’an Jiaotong University, Xi’an 710049, Shaanxi Province, China;
2. ALSTOM TD Automation, Stafford ST17 4LX, UK)
ABSTRACT: Most wind farm in China are connected to influencing factors of this phenomenon are analyzed.
power grid in concentratedly way, so the grid-connected wind
KEY WORDS: fault feature; wind turbine generator;
farms affects both secure operation of power grid and correct
concentrated grid-connection; PSCAD/EMTDC
action of protective relayings more and more evidently. Due to
relatively small capacities of wind farms and low terminal
voltage of wind turbine generators, so relative to the high
voltage side of power grid, the assembly of wind turbine
generators, package transformers and low voltage cables is
equivalent to a current-limiting reactor with high impedance,
您可能关注的文档
- 大鼠牙周炎牙正畸移动后整合素β3mRNA变化实验的研究.pdf
- 大象版五年级科学上册课件二单元精确时间步伐.ppt
- 大象版五年级科学上册课件二单元精确时间步伐97011.ppt
- 大兴安岭南端花岗岩磁化率及其岩石学意义.pdf
- 大型储油罐动力模态分析.pdf
- 大型风力机筒式塔架涡致振动数值分析.pdf
- 大型水平轴风力机传动系统动力学的研究.pdf
- 大型水平轴风力机传动系统动力学的研究01346.pdf
- 大型研发团队知识创造网络建模与模拟的研究.pdf
- 大型医院设备配置与管理.ppt
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)