- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
COMBINEDHEATamp;amp;POWER.ppt
COMBINED HEAT POWER J.R. Simplot Mountain Home, Idaho Why Co-Generate Electricity is most often generated in one of three ways From steam systems at an efficiency of 26% From simple gas turbines at an efficiency of 35% From combined cycles, gas turbine and use exhaust for steam turbine at an efficiency of 46% COMMON POWER CYCLE THERMAL EFFICIENCIES Simple Steam Cycle 25% - 35% Generate steam at high pressure exhaust steam from steam turbine to condenser. Simple Gas Turbine 30% - 35% Gas Turbine driven generator with exhaust to atmosphere. Combined Cycle 50% - 60% Gas Turbine driven generator with exhaust used to make high pressure steam, and high pressure steam used to generate additional electricity in steam turbine. Gas Turbine-Process Steam 75% - 85% Gas Trubine driven generator with exhaust used to make low pressure steam for process. COMBINED GAS TURBINE PROCESS STEAM SYSTEM ECONOMIC ANALYSES Simple boiler system requires 500 therms/hr Co-generation system requires 1300 therms/hr Co-generation also will provide 63 million kw-hr/year of electricity for sale or internal use. ESTIMATED PLANT REQUIREMENTS for 3000 tons/day FINISHED PRODUCT Peak steam 51,000 lbs/hr Average steam 38,000 lbs/hr Connected Horse Power 2000 Average electricity demand 1500 kw. Water requirements 275 gpm. POSSIBLE CO-GENERATION ALTERNATIVE Match free steam from gas turbine to average facility process steam load, and then duct fire waste heat recovery boiler to meet peak steam loads. ENERGY REQUIREMENTS FOR SIMPLOT ROLLING MILL(without combined heat power) 475 Therms of natural gas per hour to generate 38,000 lbs of process steam. Natural Gas budget of $1,995,000.00 per year 1500 kw to operate the rolling mill equipment. Electric budget including demand of $693,000.00 per year. Total utility budget of $2,688,000.00 per year. CAN A COMBINED HEAT AND POWER PLANT REDUCE THE UTILITY BUDGET? A FEW GAS TURBINE ALTERNATIVES Summary of Technology Characteristics The source is de
您可能关注的文档
- §1.2集合的运算.ppt
- §7-3 周转轮系传动比计算.ppt
- (a.k.a. Phase I trials).ppt
- 1.1.1 正弦定理的推导.ppt
- 1.3人口分布与 人口合理容量.ppt
- 1.什么叫旋转对称图形?.ppt
- 1.我的背景 ?.ppt
- 1.苹果为什么下落?.ppt
- 100 GbE Network implementations, challenges and testing.ppt
- 13C-NMR, 2D-NMR, and MRI.ppt
- Comparing Clustering Algorithms.ppt
- Competition in the Telecommunications Sector in Mexico.ppt
- Competition Issues in Manufacturing Sector.ppt
- Competitive Strategies.ppt
- Constructing Decision Trees.ppt
- Consumer Influence.ppt
- Control System Instrumentation.ppt
- COSYSMO Constructive Systems Engineering Cost Model.ppt
- Course IntroductionOverview.ppt
- Data Daze.ppt
文档评论(0)