钢铁厂对电力系统谐波与电压闪烁.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢铁厂对电力系统谐波与电压闪烁.doc

鋼鐵廠對電力系統諧波與電壓閃爍之影響分析指導教授:張文恭 博士 研 究 生:摘 要 檢討各用戶責任分界點之總和與各次諧波電流及電壓閃爍值是否超出既有之管制標準,本論文選定ADX3000及RPM分別量測台電某一次變電所161kV、4號主變壓器及161kV級鋼鐵MOF端之電壓閃爍、諧波及,管制諧波電壓閃爍管制。 量測本論文量測量測是否管制。EMTP程式之ATP版本分析本論文的貢獻包括 1)諧波及電壓閃爍管制值計算2)量測161/69kV匯流排及相關用戶MOF諧波電流及電壓閃爍值是否管制,)建立一模擬系統,分析Power System Harmonics and Flicker Analysis for Steel Plants Advisor:G.W.Chang, Ph.DStudent:.E.Hsiao Abstract To examine the total harmonic distortion of current (THDI), individual harmonic current and voltage flicker at various users’ duty point, the thesis adopts ADX3000 and RPM to measure the harmonic current, voltage flicker and power data at 161kV feeder’s terminal, the second side of the 4th main transformer of some primary substation of Taiwan Power Company and MOF point of 161kV level steel factories, and calculated the governing limits of the harmonic current and voltage flicker at each measured point according to the present standards. The thesis presents how to use the measuring instrument and its software to analyze measured data by statistical method and examines whether conformable to the present standards. Finally, the thesis will present simulations of the power transmission system by ATP edition of Electromagnetic Transients Program (EMTP) to analyze the operating condition when electric arc furnace (EAF) and filter, and discuss the transitional condition and its difference between switch-on and switch-off of the switches used by EAF and filter. The contributions of the thesis include 1) proposing a method to compute governing limits of THDI, individual harmonic current and voltage flicker, and being a reference to research in the future; 2) using the measured results from the harmonic current and voltage flicker of the 161/69kV bus and the MOF point of related users to judge whether corresponding with governing standards, and taking as background information for study in the future; 3) establishing a simulation system to analyze the stable and transition conditions of the EAF and filter.

文档评论(0)

snj01 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档