POLICY amp; DOCUMENTATION.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
POLICYamp;amp;DOCUMENTATION.ppt

AMHS WORKSHOP POLICY DOCUMENTATION AMHS WORKSHOP POLICY DOCUMENTATION Operational Requirements for facilities or services are established through Regional Air Navigation Agreement and are indicated in the Regional Air Navigation Plan. Asia and Pacific Regions Air Navigation Plan (Doc 9673) Since 1997, the Plan is in two volumes Volume I – Basic ANP Volume II – Facilities and Services Implementation Document (FASID) ATN Transition Plan envisages increase Bandwidth and upgraded protocols for trunk circuits ATN development to be in evolutionary and cost effective manner ATN infrastructure expected to be implemented in three phases Phase 1: Upgrade existing AFTN circuits where necessary to support the introduction of the ATN Backbone Boundary Intermediate Systems (BBIS) Phase 2: Implementation of the ATN regional BBIS and Phase 3: Implementation of supporting ATN BIS States should consider establishment of gateways, where required to allow inter-operation between AFTN and ATS MHS Asia and Pacific Regions Air Navigation Plan (Doc 9673), Volume II called Facilities and Services Implementation Document (FASID) contains details of the facilities and services required to be provided in order to fulfill the basic requirements of the plan and are as agreed between the provider and the user States concerned. Such agreements indicate a commitment on the part of the State(s) concerned to implement the requirement(s) specified. Most of the ASIA/PACIFIC FASID originated from the recommendations of the Third ASIA/PAC Regional Air Navigation Meeting (ASIA/PAC RAN/3) held in Bangkok in 1993 and Conclusions of Asia Pacific Planning and Implementation Regional Group. Part IV of Asia and Pacific Regional ANP, Volume II lists the Communication, Navigation and Surveillance facilities and services needed to fulfill the requirements of Plan. TABLE/CHART TABLE/CHART NAME Table CNS - 1 A AFTN Plan Chart CNS - 1 A Rationalized AFTN Plan Table CNS – 1 B ATN Router Plan Chart CNS – 1 B

文档评论(0)

zhaoxq + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档