API不符合项整改结果英文_图文.docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
API不符合项整改结果英文_图文

PAGE15 / NUMPAGES15 API不符合项整改安排表 编号对应的 标准条款不符合原因分析纠正及纠正措施 [由谁采取?提供什么证据?]完成日期 责任人 1第8文档API标准Q1第九版5.7.1.5条款 体系 不符合主要不符合:在生产工艺—锻造,热处理,无损伤检验等特殊工艺按照要求应被验证其有效。 无证据显示上述工艺被确认为有效。原因分析:The special process in the company quality system had been identified and controlled, but validation about the interval not been implemented according to API Q1 5.7.1.5. 证据: Correction:1 The tehnical department finished defining 《process validation control procedure》by June,6.more detail see attachment . 2 By June,12 , the HR department organized and implemented training on the document for related staff (see attachment 2).For special process operators ,the job qualification and certification implemented respectively(see attachment ). 3 During June,20—June,30, the technical department implemented the validation process and reported.(see attachment) Evidence :Attachment 1: all process validation control procedure;Attachment 2 :training record;Attachment 3-1:HT operator and forging operator qualification;Attachment 3-2: UT,MT checking report and certification;Attachment 4:NDE operator qualification;Attachment 5 validation report for special process;Attachment 6 forging process ;Attachment 7 :HT process Attachment 8 :UT,MT process regulation; Attachment 9 special process re-validation report(PT,UT,MT)Attachment10 Correction content Correction action:From July,1 to July 28,2015 improving actions was implemented hosted by top manager and organized by management deputy which focus on improving in production process validtion ,including identifiction and planning ,verification for special process and interactions between the processes. As well as revising the manual . 《quality management manual》 will be completed translation by ealy August and uploaded to API website. 15.6.30 郝永平 2第6文档APIQ1第九版 5.4.2b API-6A款4.2.3.1; 表 6, 7, 9; 4.6; 10.1.2.2轻度不符合:1 输入未包括在API产品规范要求中 2 设计输出未符合设计输入要求 3 完成该设计的个人同时审核了??终设计 4 设计变动未按照计划完成 不符合证据:在设计和包装环节: 法兰6B, BL, RTJ, 4 1/16”, 5000psi, L, 60K, PS

文档评论(0)

wh90404 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档