- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ISO程序文件中英文版设计和开发控制程序.doc
1. 目的:对产品设计开发全过程进行控制,确保设计和开发的新产品满足规定的要求。
Purpose:Control the whole process of product design and development to ensure that the design and development of new product meet the stated requirements.
2. 适用范围:适用于产品设计和开发的全过程。
Applicable Scope:Apply to the whole process of product design and development.
3. 职责Responsibility:
3.1董事总经理负责设计开发项目的立项、设计输入及试产交接会的组织批准工作。
The Director General shall be responsible for approving the establishment of design and development project, design input and organizing the meeting for hand-over of pre-production .
3.2技术总监领导负责产品的设计开发全过程的组织协调及审批工作。
The C.T.O will organize and coordinate the overall process of design and development of product, take charge of audit and approval as well.
3.3项目工程师负责统筹产品的设计开发、型式试验及组织设计开发过程中产品的装配测试工作。
The project engineer shall be in charge of coordinating the design and development and type-test of product, organize the work related to assembly and test during the process of design and development.
3.4 生产技术部负责配合执行产品测试及试验工作,组织产品试产,生产装配工艺文件和检验文件的编制及审工作。
The Production Dept. shall provide cooperation for test and inspection, organize the pre-production, in addition, prepare and approve the production and assembly technology and inspection documents.
3.5品保部负责编制检验标准/规程参与新产品样品的验证及试产过程中各阶段的检验测试工作The QC Dept. will draft the test criterion/ instruction, involve in verification for the sample of new product, also the test and inspection at every stage of pre-production.
3.6采购部负责协调设计开发过程中所需物资的采购工作。
The Purchasing Department will involve in ordering of material needed in the process of design and development .
3.7 生产技术部负责设计开发过程的样品试制和工艺协作。
The Production Dept. shall be responsible for building prototypes in the design and development process also the collaboration of technology.
3.8其他各部门负责完成董事总经理交办的产品配套性开发项目的协作和完善工作。
Other Departments shall be responsible for completing job of coordinating and perfecting the Production Assembling Development Project which is ordered by Director General.
4. 工作程序Procedures for work
4.1设计方案制定
您可能关注的文档
最近下载
- GB T 27875-2011_港口重大件装卸作业技术要求_高清版_可检索.pdf
- 商品混凝土采购组织供应、运输、售后服务方案.docx VIP
- 大豆籽粒贮藏蛋白7S和11S组分的QTL定位.pdf
- YOLOv5(PyTorch)目标检测:原理与源码解析课件PPT模板.pptx VIP
- 辛弃疾《西江月》通用课件(页).pptx VIP
- 工程技术液压工程师岗面试题库参考答案和答题要点.docx VIP
- TCFLP 0026-2020-散装液体化学品罐式车辆装卸安全作业规范.pdf VIP
- 2025年高等学校英语应用能力考试A级试卷及答案.pdf VIP
- 疾控中心培训课件:《公安系统职业性相关传染病防治知识及职业暴露预防》.pptx VIP
- MSA测量系统分析自动表格.pdf VIP
文档评论(0)