Section_C_Part_II100.doc-JohnsonSpaceCenter-Nasa.docVIP

  • 2
  • 0
  • 约3.46万字
  • 约 11页
  • 2015-12-22 发布于湖北
  • 举报

Section_C_Part_II100.doc-JohnsonSpaceCenter-Nasa.doc

Section_C_Part_II100.doc-JohnsonSpaceCenter-Nasa.doc

PART II PERFORMANCE BASED CONTRACT STATEMENT OF WORK (PBC SOW) 0. INTRODUCTION 0.1. This PBC SOW defines the engineering and science products and services in terms of quantities to be delivered and the parameters and boundaries relating to them as estimated through the life of the contract for portions of the contract which have been converted to performance based contract (PBC) form. As these conversions continue to be made, the PBC SOW language will be initially developed and priced in a bilateral Technical Work Plan (TWP)/Basis of Estimate (BOE). This TWP/BOE will be jointly developed and agreed to by the contractor and the Government and will be summarized before being included in this PBC SOW. The TWP will provide adequate detail to describe the quantities of work to be performed for each fiscal year (FY) and to develop a BOE for each FY through the end of the contract. The BOEs for each TWP, as agreed to by both parties, will be summed together to become the Estimated Cost for the PBC contract. The BOEs agreed to for the duration of the contract may not be changed except by Contract Change Order or Modification; however, the quantities of work and BOEs for each FY may be changed within the scope of the PBC SOW through TWP changes. These TWP changes may require shifts in resources and deliverables between FYs, but should not change the totals to be delivered through the end of the contract. The contractor shall perform the work and deliver the products described in the PBC SOW consistent with all applicable documents referenced in this contract including the TWP. 0.2 The TWP (and the accompanying BOE) may require revision annually, and possibly more frequently. These revisions may be made without issuance of a contract change order or contract modification as long as they do not require changes to the PBC SOW or other portions of this contract and are agreed to by the appropriate Contractor and Government personnel. 1. TEST FACILITY, MAINTENANCE, A

文档评论(0)

1亿VIP精品文档

相关文档