sixweekindustrialtrainingathindustanmachinetoollimited.PDFVIP

  • 13
  • 0
  • 约2.25万字
  • 约 34页
  • 2015-12-22 发布于湖北
  • 举报

sixweekindustrialtrainingathindustanmachinetoollimited.PDF

sixweekindustrialtrainingathindustanmachinetoollimited.PDF

SIX WEEK INDUSTRIAL TRAINING AT HINDUSTAN MACHINE TOOL LIMITED (HMT) PINJORE TRAINING REPORT SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF DEGREE OF BACHELOR OF TECHNOLOGY IN MECHATRONICS ENGINEERING SUBMITTED BY: SUBMITTED TO XYZ ABCD ROLL NO. ******** (H.O.D.) 5THSEM M M ENGINEERING COLLEGE MAHARISHI MARKANDESHWAR UNIVERSITY MULLANA AMBALA (Haryana) 2013-14 INTRODUCTION The Third Machine Tool Factory of HMT limited located at st Pinjore near Chandigarh went into production on 1 October 1963. It was the first HMT factory to be located away from HMT complex at Bangalore, where two machine tools factories and a watch factory had earlier been established. These factories was designed, build and commissioned by Indian talent without any foreign assistance in a record period of 17 months of breaking the ground on May 2, 1962 at a capital investment of Rs. 750 lakhs (inclusive of the township) and was formally inaugurated by Pt. Jawaharlal Nehru,the Prime Minister of India. Over the years HMT successfully diversified into other engineering are

文档评论(0)

1亿VIP精品文档

相关文档