EnglishforDrillingEngineering.ppt

  1. 1、本文档共48页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
EnglishforDrillingEngineering.ppt

Personnel Involved in Drilling Operations Operations manager: Generally responsible for all operational matters to do with drilling and production related activities. Drilling manager: Responsibilities include the day to day running of the drilling department, liaison with government authorities, overseeing the work of the senior drilling engineers, acting as the ultimate technical decision-maker for problems or disputes. Senior drilling engineer(SDE): Daily responsibility for one or more drilling rigs, well planning, daily reporting of drilling activities, supervising the work of more junior staff members, daily liaison with the drilling contractor and other service companies involved in the operation, and evaluating tenders for services. Logistics coordinator: All activities related to obtaining, storing, and shipping equipment and personnel to the wellsite and back. Coordinates land, sea, and air transports; supervises the storage yards; and monitors rental equipment to insure it is returned promptly once finished. Personnel Involved in Drilling Operations Drilling engineer(DE): Responsible for technical work on drilling programs, technical evaluations, and engineering studies; and other work as directed by the SDE. Technical assistant: Works with the DE to help compile reports, locate information, filing, etc. Drilling supervisor(DS): Often called the “company man”; the most senior representative of the operator at the wellsite. The DS is responsible for coordinating all drilling related activities, using the drilling program as guidance but making changes as necessary for a safe and efficient operation; instructs the rig crews via the toolpusher; ensures that safe practices are maintained; manages the various contractors on hire to the operator. Night drilling supervisor: Who will be on shift during the night(6 p.m. to 6 a.m. is usual). It often prepare the daily drilling report for the DS to check and send in the morning(6:30). Personnel Involved in Drilling

文档评论(0)

此项为空 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档