WhatdoweexpectfromtheCCCAvisionforTS.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
WhatdoweexpectfromtheCCCAvisionforTS.doc

EDMS Nr: 590511 TS-Note-2005-014 Group reference: TS-CV 24 May 2005 What do we expect from the CCC A vision for TS N. Bangert, M. Batz, O. Boettcher, G. Burdet, G. Cumer, R. Nunes, P. Pepinster, T. Riesco Abstract Control room operation of the Technical Infrastructure under the responsibility of the Technical Support Department (TS) was carried out for decades based on the round-the-clock operation from the Technical Control Room (TCR). The TCR functions and services have been integrated in the AB Department in January 2005 and will finally be assumed by the CERN Control Centre (CCC) in the beginning of 2006. The CCC will be in charge of beam, cryogenic and the Technical Infrastructure Operation for the LHC and its injectors. A well functioning operation and maintenance of the Technical Infrastructure will continue relying on the quality of control room services. The TS expectations of CCC operation are outlined in this paper, which shall result in a well-defined operational framework, for both the equipment groups and the control room team. Introduction The monitoring and control room operation of the Technical Infrastructure under the responsibility of the TS department was carried out by the TCR until the end of 2004. Since then all the functions and services so far covered by the TCR have been integrated in principle in the Meyrin Control Room (MCR) and shall be continued in the CCC as of the beginning of 2006. In the context of the CCC from where all CERN accelerators, cryogenic installations and the Technical Infrastructure will be operated, the TS expectations for the CCC have to be clearly established. On the one hand the integration of all control room teams in a single location will enhance communication and co-ordination of operation and maintenance activities carried out by different teams in different departments. On the other hand the operation of the parts of the Technical Infrastructure, which is not directly related to the accelerator operation m

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档