- 1、本文档共69页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
江畔人家项目投资可行性分析
XX大学毕业设计
XX·江畔人家
XX大学建设管理与房地产学院
二OO九年六月
摘 要
可行性研究是编制设计任务书的重要依据,也是进行初步设计和工程建设管理工作中的重要环节。通过对项目的主要内容和配套条件,如市场需求、资源供应等,从技术、经济、工程等方面进行调查研究和分析,,提出项目意见,为项目决策提供依据的一种综合性的系统分析方法。
关键字:可行性分析,项目投资,投资估算,筹措方案,财务评价
ABSTRACT
Feasibility study is the important basis of project design, is also the important link of the preliminary design and construction management. Feasibility study aim at the analysis of the main content of the project and supporting conditions, such as supply and demand of the market, supply of resource so on , base on the forecast, it will put forward some suggestion in investment . It is a comprehensive system analysis method to put forward whether the project is worth of investment and provide advice on how to construct which is the basis for project decision-making.
The feasibility analysis of real estate investment project this time is located at ShaBin road in ShaPingba district, ChongQing, will be invested and developed by ChongQing ZhuoYue real estate development company, the total planning investment is 25585 square meters, with a total construction area of 102620 square meters. The land is flat and solid and around with the consummate basic infrastructure, is believed the ideal land for construction. The authors had reconnoitered peripheral condition of land practically, Firstly analyze macro environment of the macro-economy in China, real estate industry development in China, investment environment of ChonQing , the real estate market situation of ShaPingba district and so on .Make the project feasibility study based on macro environment. And then, make the microscopic analysis of supply and demand of the real estate market and the condition of the area, the basic situation of land-self, analyze the project market and forecast the market demand, make analysis of planning design and development schedules, investment analysis, financing plan analysis of project investment, risk analysis to the project and profitability, solvency etc which belong t
您可能关注的文档
- 楼控BAS设计方案.doc
- 榴桐寨隧道衬砌专项施工方案.doc
- 槽钢悬挑脚手架工程施工方案.doc
- 榜式堡农业综合开发土地治理项目施工组织设计.doc
- 樟园二期预制管桩招工程标文件2015.3.25.doc
- 樟新盐化工基地进场公路上跨京九线 K1551+353高子巷立交桥工程施工组织设计.doc
- 模具加工单元式生产线技改项目建议书(代可研报告).doc
- 模具设计油杯说明书 毕业设计.doc
- 模拟机动勤务训练设施建设工程施工组织设计1.doc
- 模拟机动勤务训练设施建设工程施工组织设计.doc
- 护理部主任工作总结范文.pdf
- 护理自我总结范文.pdf
- 护理年终总结范文大全.pdf
- (八省联考)2025年河南省新高考综合改革适应性演练数学试卷带解析附答案(满分必刷).docx
- 2025年青海石油管理局校园招聘模拟试题附带答案详解带答案.docx
- 高中班主任应对突发事件的计划.docx
- 2025年鸡西煤矿机械有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版完.docx
- 2025年陕西鼓风机(集团)有限公司校园招聘模拟试题附带答案详解及参考答案1套.docx
- (八省联考)2025年辽宁省新高考综合改革适应性演练数学试卷带解析及参考答案(满分必刷).docx
- 2025年青海石油管理局校园招聘模拟试题附带答案详解完整.docx
文档评论(0)